Procurement Summary
Country: Germany
Summary: Sv-Fla-260511-006 - Sost - Renovation of the Munich Olympic Stadium, Electrical Installation of External Distributors
Deadline: 30 Jun 2026
Posting Date: 18 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143540877
Document Ref. No.: 419622-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45311200 - Electrical fitting work
45310000 - Electrical installation work
45314300 - Installation of cable infrastructure
45311100 - Electrical wiring work
45232000 - Ancillary works for pipelines and cables
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
SV-FLA-260511-006 - SOST - Renovation of the Munich Olympic Stadium, electrical installation of external distributors SOST - Renovation of the Munich Olympic Stadium, electrical installation of external distributors The subject of the electrical work is the renewal of the external electrical supply As part of the main construction project. Existing connection lines in the TN-C network form will be taken out of service and replaced by new supply lines in the TN-S network form. Civil engineering services (e.g. earthworks, cable trenches, shafts, pipe laying) are not included this list of services. Approximately 26 outdoor distributors will be dismantled, disposed of and replaced with new distributors. The execution is carried out in accordance with the client's specifications regarding housing type, equipment and labeling. Already renewed external distributors remain in place and must be connected to the new supply lines. The connection is made via newly laid power cables (0.6/1 kV according to VDE 0276-603). The main cable types used are NYCWY with cross-sections of 4x35/16 to 4x240/120. The Total length is approx. 13 km. The cables are routed via cable conduit systems with reserve capacities provided by the customer and connected to the low-voltage switchgear via building bushings prepared by the customer. The cable pull tube system includes approximately 66 cable shafts and a total length of approximately 3.1 km. Outdoor distributors that are no longer needed will be dismantled. Associated cables must be disconnected; Remove and dispose of pipes in empty pipes...
Document Type: Contract Notice Reference Number: SV-FLA-260511-006 Contract Type: works Authority Type: pub-undert-ra Doc Title: SV-FLA-260511-006 - SOST - Renovation of the Munich Olympic Stadium, electrical installation of external distributors Dispatch Date: 2026-06-17 Publish Date: 2026-06-18 Submission Date: 2026-06-30
Documents
Tender Notice