Procurement Summary
Country: Germany
Summary: Surface Treatment B 182, K 8922, K 8925, K 8924
Deadline: 05 May 2026
Posting Date: 16 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139625240
Document Ref. No.:
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
a) Client: Official name: District Office of North Saxony; Area/Department: Department of Construction and Environment, Road Construction Authority; Street, house number: Dr.-Belian-Straße 4 - 5; Postal code: 04838; Location: Eilenburg; Country: DE; Internet address: https://www.landkreis-nordsachsen.de/; Email: [email protected] b) Type of award: Public tender c) Offers can only be submitted electronically. d) Type of contract: Road construction service e) Place(s) of execution: Official Name: North Saxony district (B 182, K 8922, K 8925, K 8924); exact areas see map included in the documents; Postal code: 04758; Location: Cavertitz; Country: DE f) Type and scope of the service: are the subject of the repair Surface treatments on the B182, K8922, K8925 and K8924 (see map included in the documentation). The following areas are affected: ― B6 Paußnitz - Aussig 4645 106 - 4545 123 overall length 1, 360 m ― K8922 Schirmenitz - Klingenhain 4645 003 - 4645 008 overall length 1, 190 m ― K8924 Cavertitz - Treptitz 4644 003 - 4544 009 Overall length 1, 438 m ― K8925 Sörnewitz - Klötitz 4644 208 - 4644 209 Overall length 1, 257 m The lanes have a width of 5.00 m to 7.00 m on. Surface treatment The following essential measures are planned: ― Traffic safety ― Cleaning before construction ― Covering of built-in parts ― Mechanical spraying and sprinkling of the damaged areas ― Cleaning after construction Construction process Taking into account all of the aforementioned boundary conditions and circumstances as well as the The client's construction time requirement is to determine the detailed construction process under the contractor's own responsibility and to be agreed with the client before construction begins. However, the construction process must be designed in such a way that the unavoidable consequences of the construction work Traffic disruptions are kept to a minimum. The construction process is not specified in detail. It remains at the disposal of t...
Documents
Tender Notice