Procurement Summary
Country: Italy
Summary: Supply, Installation and Maintenance of a Pem Electrolyser for Hydrogen Production at Jrc Ispra
Deadline: 30 Jul 2026
Posting Date: 15 Jun 2026
Other Information
Notice Type: Procurement Plan/GPN/PIN
TOT Ref.No.: 143325738
Document Ref. No.: 408830-2026
Competition: ICB
Financier: European Commission
Purchaser Ownership: Public
Tender Value: EUR 1100000
CPV Classification
42980000 - Gas generators
45259000 - Repair and maintenance of plant
45310000 - Electrical installation work
71320000 - Engineering design services
24111600 - Hydrogen
45251100 - Construction work for power plant
45253100 - Demineralisation plant construction work
45255800 - Gas-production plant construction work
45317200 - Electrical installation work of transformers
51100000 - Installation services of electrical and mechanical equipment
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Supply, Installation and maintenance of a PEM Electrolyser for Hydrogen Production at JRC Ispra
The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg. The main equipment will be delivered in a containerized/skid version divided into three specific areas: a control panel area with the AC/DC converter, a water purification unit, and an ATEX-classified area containing the stacks and gas purification treatment. In addition to the containerized unit, the scope of supply includes several external components: - An MV/LV transformer - A thermal management system (dry cooler) - A low-pressure hydrogen storage system consisting of a cylinder rack at 30 bar with a total volume of 5 m3 - A gas blender installed on the outlet piping after the storage Finally, the procurement includes a comprehensive service package covering the Factory Acceptance Test (FAT), Site Acceptance Test (SAT), ATEX verification, staff training, two years of spare parts, and a 3-year maintenance contract. Reason for Purchasing The primary objective of this procurement is to produce green hydrogen by harnessing the renewable energy generated from the JRC Ispra site's internal photovoltaic (PV) plant. Currently, the site has a 1....
Document Type: Prior Information Notice
Reference Number: EC-JRC/IPR/2026/OP/3317-PIN
Contract Type: supplies
Estimated Value: 1100000 - EUR
Authority Type: eu-ins-bod-ag