Procurement Summary
Country: Mauritania
Summary: Solar Rural Electrification Project in Aftout El Chargui Zone
Deadline: 16 Apr 2016
Posting Date: 07 Apr 2016
Other Information
Notice Type: Tender
TOT Ref.No.: 5981480
Document Ref. No.:
Competition: ICB
Financier: Islamic Development Bank (ISDB)
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
09330000 - Solar energy
45311000 - Electrical wiring and fitting work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Tenders are invited for Solar Rural Electrification Project in Aftout El Chargui Zone.
The Government of Mauritania has received Loan and Installment Sale financing in the amounts of US$ 6.90 million (US$ 4.90 ISFD Loan and US$ 2.00 million IDB Loan) and US$ 8.00 (Installment Sale) equivalent from the Islamic Development Bank toward the cost of the solar rural electrification project in Aftout El-Chargui zone, and it intends to apply part of the proceeds to payments for goods, works, related services and consulting services to be procured under this project. OFID is co-financing the project with an amount of US$ 11.93 million and the Government of Mauritania with an amount of US$ 3.60 million.
The general objective of the project is improving the living standards of the population by supplying clean renewable energy to rural communities of 30 localities in the 3 regions of Assaba, Gorgol and Tagant that are affected by extreme poverty. The project will support the progressive transformation and improvement of living conditions of the population, through the provision of reliable electricity connections to rural households, water systems, health clinics and schools. It will also foster the development of small businesses in the project area.
Upon completion, the project will (i) supply electricity to 5.450 households in 30 localities, (ii) contribute to increase the access rate to electricity in rural areas by 7% by 2017, (iii) avoid annually 15, 000 tons of C02 equivalent emissions through the acquisition of 2.6 MWp of solar photovoltaic power plant and the necessary electricity grid.
The project is comprised of the following components financed by IDB and OFID:
i. Acquisition and installation of a power plant including (a) 2.6 MW Solar Photovoltaic power plant over a surface area of about 5 ha near the Foum Gleita dam, and (b) 2x 0.250 MW back-up diesel generators;
ii. Electrical networks (MV and LV distribution lines), and customer connections: (a) 167 km of 33 kV overhead medium voltage (MV) line with 148 mm conductor from the plant to El Ghayrc where a MVA 33/15 kV substation will be installed; (b) 77 km of 33 kV overhead lines with 54.6 mm conductor for the connection of different localities; (c) 31 overhead MV/LV transformers; (d) 68 km of low voltage (LV)
networks; and (e) 5, 450 household connections.
Documents
Tender Notice