Procurement Summary
Country : Germany
Summary : Renaturation Koeditzbach/Rain Overflow Basin - Main Collector C Laying Drinking Water Pipe, Gas Pipe and Electrical Cable
Deadline : 22 Jul 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 122219578
Document Ref. No. : Oe_28/2025
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Earthwork, hydraulic engineering work, road construction work, drainage channel work, concrete and reinforced concrete work, water supply lines
Title 0 general, common services
Title 1 Renaturation Koeditzbach, Koeditz desert
approx. 175 m water expansion
approx. 65 m expansion access road north b = 4.50 m
approx. 150 m expansion access road south, b = 3.50 m
Width
Establishment of bridge structure 2
Establishment of gabion support wall
2.00-3.50 m height
approx. 25.00 m in length
New construction street lighting
11 st lights
planting
Title 2: Drainage channels/Rueb
approx. 11 m laying mixed water canal DN 400 pp, T. up to 3.75 m
approx. 18 m laying mixed water canal DN 600 GfK, T. up to 4.75 m
approx. 13 m laying mixed water canal DN 900 GfK, T. up to 4.75 m
approx. 108 m laying mixed water canal DN 1000 GfK, T. up to 4.75 m
approx. 22 m laying mixed water canal DN 1100 GfK, T. to 3.25 m
approx. 24 m installation storage space channel (strand A and B) DN 1800 GfK, each
approx. 35 m laying relief channel MA 1600/1000, T. up to 1.60 m
approx. 85 m laying dirty water channel DN 200 pp, t.at up to 3.50 m
approx. 100 m manufacture cable ditch
2 St. Relief shaft storage space channel DN 2800 GfK, t. approx. 3.50 m
1 St. Tangential shaft DN 1800 GfK
1 St. GfK finished shaft DN 2800, T. approx. 2.50 m
1 St. GfK inlet shaft 1 DN 1500, T. approx. 3.20 m
1 St. GfK inlet shaft 2 DN 1500, T. approx. 3.20 m
1 St. GfK throttle shaft DN 2600, T. 3.40 m
5 hours of precast concrete shafts DN 1000 - 1200
5 St. Produced concrete shafts DN 1500 - 2000
2 St. Tangential shafts GfK DN 1000
Title 3: EMSR technology
- EMSR technology for rain overflow basins HS C (Sku)
(Energy supply, low -voltage switchgear, PLC, measurement technology)
approx. 180.00 m - laying hybrid cable/assembly
- Connection Rueb an...
Process: Free State of Thuringia, district of Saalfeld-Rudolstadt, Saalfeld-Saale
Documents
Tender Notice