Procurement Summary
Country: Germany
Summary: Refurbishment of the Meininger Footpath / Dreissigackerer Strasse - 1St Construction Phase: Print Reduction to Dreissigackerer Strasse
Deadline: 23 Jul 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 122145029
Document Ref. No.:
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
a) Public client (awarding office) Name and address: City administration Meiningen Schlossplatz 1 98617 Meiningen Telephone: +49 3693454184 Fax: +49 3693454149 E-Mail: ZVS@meiningen.de Internet: https://www.meiningen.de/ b) Processing: Public tendering, VOB/A award number: 2025ZVS012 c) Information on the electronic procurement procedure and for the setting and decryption of the documents approved offer of offer electronically in text form with advanced/m signature/seal with qualified/m signature/seal in writing d) Type of the execution of construction services e) Place of execution 98617 Meiningen f) Type and scope of the performance, if necessary divided according to the loose type of performance: drinking water supply, energy supply, road construction, street lighting Scope of performance: LT 00 - General services construction site equipment, traffic safety, security measures, Earth fabrics of the excavation positions (provision area, sampling, declaration analyzes, recycling) LT 01 - drinking water supply approx. 605 m2 of asphalt mounting, thickness 10 - 15 cm approx. 370 m³ of frost protection layer / BK 0.3 to BK 1.0*0/45 approx. 615 m2 AC 32 Make TN approx. 715 m3 pipe trench excavation (main line, house connections and provisions) approx. 372 m drinking water line D 110 x 10 mm PE 100-RC 2 pieces underfloor hydrante DN 80, PN 16 2 pieces of wedge oval slide DN 100, PN 16 approx. 60 m interim water line D 90 x 8.2 mm PE 100-RC house connection line D 40 x 3.7 mm PE 100 -RC 4 pieces of printing drilling valves D 110/63 LT 02 - Energy supply approx. 580 m2 of asphalt fastening, thickness 10 - 15 cm approx. 840 m2 plane. About 500 m³ of cable ditch approx. 170 m³ of filling material (sand bed) approx. 130 m³ of compacting material in cable moat approx. 400 m cable protection tube 50 x 4.6 for LWL cabling l...
Documents
Tender Notice