Procurement Summary
Country: Germany
Summary: Redesign of the Drinking Water Supply System of the Nonnweiler Municipal Waterworks
Deadline: 08 Apr 2026
Posting Date: 01 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138825801
Document Ref. No.: 225386-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: EUR 7300000.00
CPV Classification
45221250 - Underground work other than tunnels, shafts and subways
45247110 - Canal construction
44162500 - Drinking-water piping
45232151 - Water-main refurbishment construction work
45112100 - Trench-digging work
44164310 - Tubes and fittings
45311200 - Electrical fitting work
45315600 - Low-voltage installation work
48921000 - Automation system
32522000 - Telecommunications equipment
32581100 - Data-transmission cable
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The municipality of Nonnweiler is planning to redesign the drinking water supply system of the Nonnweiler municipal waterworks. The subject of this tender is the laying of new drinking water pipes, the construction of a pressure boosting system, the Laying of combined sewers and the conversion of wells I and II in the Nonnweiler district of Primstal. The award unit VE01 Earthworks, pipeline construction, sewer construction, electrical/MSR technology essentially includes the following construction services: - Approx. 300 m³ Asphalt demolition - Approx. 10, 000 m³ of trench excavation - Approx. 7, 000 m of TW pipe laying DN 200 to DN 300, PN 40 - Approx. 90 m of sewer construction DN 400 - Approx. 400 m of liner renovation DN 400 - Pressure booster system, well renovation, elevated tank connections - Delivery and laying of 7400 m energy fork NAYY-J 5x185mm² - Delivery and laying of 6000 m of micro pipe bundles - Delivery and assembly of a compact station / transformer station (630 kVA) - Delivery and assembly of two stationary emergency power generators - Delivery and assembly from one PV system (approx. 44 kWp) - Delivery and assembly of low-voltage distributions (approx. 12 control cabinets to control the pumps via frequency converters) - Delivery and assembly of the system measurement technology - Realization of the system cabling - Realization of the PLC system automation - Connection of the PLC system automation to the existing process control system - Realization of bidirectional data transfer between process and control technology - Delivery and assembly...
Document Type: Contract Notice Reference Number: VE01 Contract Type: works Estimated Value: 7300000.00 - EUR Authority Type: la Doc Title: Redesign of the drinking water supply system of the Nonnweiler municipal waterworks Dispatch Date: 2026-03-30 Publish Date: 2026-04-01 Submission Date: 2026-04-08
Documents
Tender Notice