Procurement Summary
Country: Germany
Summary: Pu 327 Carpentry Work According to Din 18 355, 18 357, 18 361, 18 363, 18 459 - House 2-4 - 2483/2025
Deadline: 16 Oct 2025
Posting Date: 26 Sep 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 127077298
Document Ref. No.: 2483/2025
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
VE 327 carpentry work according to DIN 18 355, 18 357, 18 361, 18 363, 18 459 - House 2-4 Facade renovation House 1, 2, 3, 4 and 5 in 2 construction phases: 1st construction section House 1, 5 and 4 - approx. 2025/2026 2. Simple and compound window wood approx. 136m demolition window seat wood inside approx. 165m demolition window sill titanium zinc outside carpenter work work and assembly planning 2 st outdoor window door New wood pine 2-part 68 St. simple Wood pine 4-part 35 St. 4 St. Easy window round new wood 2-part 2 St. Easy Wood pine 1-piece incl. 107 st window fold fan up to 42db 560m cover strip softwood 22x2mm 45 st frame widening solid wood pl. 96 st windowsill wood pine inside NEW D 25mm, b from 25cm to 35cm, L from 75cm Up to 131cm including 148 ST ventilation grilles aluminum white 150x500mm 2 pc step and setting level exit window door glow 560m plaster glatted base inside Lime cement plaster D 10-15mm, thermal insulation calcium silicate D 10 mm, filling Q3 and surface reinforcement fleece insert 10 St. outdoor doors Gait and schliessbar Make 18.5 m2 gladorfolia satined coating work approx. 49 m2 roughen matt loops, remove non-load-bearing layer, 1x filling synthetic resin, overhaul coating Alkydharz box window wood existing 1- and 2-winged approx. 42m2 roughening matt loops, remove non-loadable layer, 1x filling synthetic resin, overhaul coating alkydharz out of wood existed, dilapidate with skylight other 20 st inner blind again. Assemble 16 st mounting curtain re -assemble 6 st pleated re -assembly 4 st roller blind disassemble execution start With the execution must be started at the latest 10 working days after commissioning (work planning). Wah ...
Documents
Tender Notice