Procurement Summary
Country: Germany
Summary: Pu 07- Plaster and Stucco, Wall and Painting Work, Outside
Deadline: 15 Sep 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 124381636
Document Ref. No.: ZVB25153
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
VE 07- plaster and stucco, wall and painting work, outside the advertised performance includes the plaster and stucco, wall and painting work, outside, in existing construction. Measures: construction site facility for your own performance, documentation documents, construction site installation plan, schedule, inventory, inventory, Mapping of the damaged areas and catalog of measures, sampling, analyzes of the facade existing plaster, testing of the surface tensile strength and adhesion strength of the facade existing plaster -342 m2 demolition and disposal of facade plaster in partial areas -102 m demolition and disposal of cornice -120 M2 Color removal on facade plaster -200 m Color removal on Reviation and Faschen demolition of various cornice covers, lights, dowels, hooks, cables, obstacle caps, lightning protection lines, etc. from the facade -150 st demolition of mortar fillings in the masonry (clinker), 5/5 cm to 20-30/30 cm -803 m2 Cleaning the plaster facade and vaulted ceiling -200 m cleaning the plaster reveals -226 m2 Cleaning the clinker facade and vaulted ceiling -470 m Clean the clinker reveals -226 m2 facade surface from visual masonry (clinker): renovate approx. 30% of the surface in partial surfaces (renovate masonry joints, renovate, Exchange of damaged clinker stones, clinker misalignment/outbreaks with stone restoration mortar, close cracks with a stone restorer mortar) -470 m Revoos area from visual masonry (clinker): Restoring approx. 30% of the surface in partial areas (renovation, replacement of damages, replacement of damaged ones Place the clinker stones, clinker misalignment/outbreaks with stone restoration mortar, close cracks with stone restoration mortar) -803 m2 facade surface made of structure plaster and smooth plaster: Restoring approx. 30% of the surface in partial areas (absorption, holes, tears, etc. Close, renewal of partial wall and column surfaces) -112 m smooth plaster of the cornice tapes 2ndog, h/t = 15/10 cm, as pulled s...
Documents
Tender Notice