Procurement Summary
Country: Uganda
Summary: Provision of the, Design, Manufacture, Supply, Transportation, Construction, Installation and Commissioning of Turbines and All Other Associated Works (Civils, Substation and Electro-Mechanical), Including Spare Parts
Deadline: 17 Dec 2015
Posting Date: 07 Dec 2015
Other Information
Notice Type: Tender
TOT Ref.No.: 4566782
Document Ref. No.:
Competition: ICB
Financier: African Development Bank (AfDB)
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
42110000 - Turbines and motors
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Expression of Interest (EOI) are invited for Provision of the, Design, Manufacture, Supply, Transportation, Construction, Installation and Commissioning of Turbines and All Other Associated Works (Civils, Substation and Electro-Mechanical), Including Spare Parts. EPC assignmentsfor Kikagati Hydro Power Project, Uganda. The proposed ‘low head- ‘run of the river- Hydroelectric Project will be constructed on the site of an earlier 2 x 2MW hydroelectric power plant. The proposed new plant will comprise: · A river weir approximately 170 m total length and of maximum height 11.5 m incorporating a gated spillway and flushing sluice, · Power canal intake structure including coarse intake screens and stop logs, · Power canal, · Fine trash racks and gates at intake for turbine generator units, · Powerhouse, · Two -Three bulb, Pit Type or Vertical Kaplan turbines generator units and associated auxiliary plant, and · Two main transformers, switchyard and connection to the two REA 33 kV transmission lines. The proposed site is located about 328 KM from Kampala via Masaka, Mbarara and Isingiro and shares a boundary with Tanzania. Some of the works will need to be undertaken in Tanzania.
Documents
Tender Notice