Procurement Summary
Country : Germany
Summary : Project "Sgm (Sustainable Growth Mitte)-Mitte Ehwe"-Lot 1: Planning, Delivery, Assembly and Commissioning of 3 (Three) E-Hwe a 40 Mwth and Replacement of 3 (Three) District Heating Pumps, Including the Included ...
Deadline : 07 Jun 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 118806362
Document Ref. No. : 2025002388
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Project "SGM (Sustainable Growth Mitte)-Mitte Ehwe"-Lot 1: Planning, delivery, assembly and commissioning of 3 (three) E-HWE a 40 MWTH and replacement of 3 (three) district heating pumps, including the associated complete plant construction at the HKW Mitte location (EPC Light SGM)
Heat generation mixes and to ensure heat supply in the Berlin district heating network plans to establish an electrical hot water generator system (E-HWE) at the HKW Mitte location. The system is used to provide up to 120 MW thermal performanceFeeding into the existing district heating system. The establishment of these hot water generation systems was summarized in a project (here referred to here as the overall project), which essentially consists of 4 (four) loose: Lot 1: Planning, delivery, assembly and commissioningFrom 3 (three) E-HWE a 40 MWTH and replacement of 3 (three) district heating pumps, including the associated complete plant construction at the HKW Mitte (EPC Light SGM) location, Los 2: High and civil engineering services for the construction of an HWE building, switchgear building and transformer building at the HKW location (Bauenlos SGM) ---not part of this announcement los 3: two (2) 125 mva 110 kv / 22 kv transformers for the hkw mitte (ptsgm) -not part of this announcement los 4: two (2) 110 kv gis systems with simple collection rail, consisting of a feed-in and two departure fields, includingprotection and control technology, for the hkw mitte (gissgm) - not part of this announcement of this procurement project is the lot 1. this includes:the e-hwe system consisting of three electrodes, each with 40 mw thermal output. the boilers are hydraulically in theexisting ...
Documents
Tender Notice