Procurement Summary
Country: Germany
Summary: Project Control Project "Hornsches Tor
Deadline: 14 Aug 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 122883234
Document Ref. No.: 2025-0179
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
With the Detmolder Gesellschaft fuer Stadtentwicklung (DGS) in the center of the city center, the city of Detmold is developing a mixed, urban planning project under the name "Hornsches Tor". The project is divided into several usage units on a total of six levels. 1. Project structure - BGF according to the level of use: - basement (UG): approx. 1, 580? M2 BGF - warehouse, technology and social areas - ground floor (EG): approx. 1.640? M2 BGF - Large -scale retail (fashion house) - Upper floor (1.960? M2 BGF - retail (fashion store) - Upper floor (2. OG): approx. 1, 600? M2 BGF - office and/or practical uses - upper floor (3rd floor) and attic: approx. 400? M2 BGF - Rooftop -Cafe approx. 980? M2 GAB units Technology areas (DG) 2. Parallel construction project - parking garage with underground car park: - The city of Detmold builds a parking garage with parallel to building construction Integrated underground car park in direct connection to the overall project. - total number of places: approx. 335 parking spaces - The parking garage is used for public use as well as the connection of retail and other uses in the property. - The completion of the parking garage has at the same time as the Building construction. 3. Technical-functional features:- Development: three staircases with connection to all levels, barrier-free development via passenger and cargo elevators (use by retail). - TGA/media supply: heat, water and electricity up to the respective Handover points on site, distribution lease side. Preparation of roof areas for PV system (retail); Additional standing plant for PV system in the parking garage. - Climate/ventilation technology: Technically demanding system concept, etc. Evaporation cooling; Return cooler on roof or on Fire wall, sound insulation provided in the basement. - Fire protection: Implementation of a superordinate fire protection concept with sprinkling, escape routing, fire section separation. - Sound/heat protection: Implementation ...
Documents
Tender Notice