Procurement Summary
Country: Germany
Summary: Plant Technology for Setting up a Power-To-Gas System with Methanation
Deadline: 22 Oct 2026
Posting Date: 23 Sep 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 149676610
Document Ref. No.: 656688-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45255800 - Gas-production plant construction work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Lot 1: Electrolysis and hydrogen storage
Lot 2: methanation
The SWT-AoeR is planning to build a power-to-gas plant for hydrogen production subsequent methanation at the site of the central biogas processing plant of the biogas partner Bitburg. As part of this procurement process becomes The necessary system technology to realize the project was put out to tender in two lots.
Construction of an electrolysis plant with a nominal electrical output of approx. 1 MW for the production of renewable hydrogen
For decoupling von For hydrogen production and downstream use, a hydrogen storage facility with a storage capacity of approximately 150 kg of hydrogen must be provided.
The scope of services includes in particular:
- Electrolyser including water treatment as a container-based complete system,
- all necessary for operation Ancillary units and auxiliary systems,
- Hydrogen storage including the necessary compression and safety devices,
- Piping systems between the electrolyser, hydrogen storage and the transfer point including expansion system for downstream methanation,
- Load and data cables from a defined interface in an on-site transformer/transfer station as a supply line to electrolysis,
- measurement, control, regulation and automation technology,
- safety equipment including explosion protection,
- Foundations including all required...
Document Type: Contract Notice
Contract Type: works
Authority Type: body-pl-la
Doc Title: System technology for setting up a power-to-gas system with methanation
Dispatch Date: 2026-09-21
Publish Date: 2026-09-23
Submission Date: 2026-10-22
Documents
Tender Notice