Procurement Summary
Country: Germany
Summary: Planning, Setting up and Operating a Modular Real-Time Early Warning System with a Sensor Network, Data Platform and Data Forecast Model for Flood, Heavy Rain and Drought Events in the Ar Area...
Deadline: 11 Jun 2026
Posting Date: 11 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 141051083
Document Ref. No.: 319966-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
72262000 - Software development services
38290000 - Surveying, hydrographic, oceanographic and hydrological instruments and appliances
35125100 - Sensors
72300000 - Data services
72263000 - Software implementation services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Planning, setting up and operating a modular real-time early warning system with a sensor network, data platform and data forecast model for flood, heavy rain and drought events in the AR area... Planning, construction and operation of a modular Real-time early warning system with sensor network, data platform and data forecast model for flood, heavy rain and drought events in the area of the ARGE Solidarischer Flood Protection e.V. The ARGE Solidarischer Flood Protection e.V. intends to Procurement of a modular digital early warning system for the early detection and forecasting of flood, heavy rain and drought events in the ARGE area. The system is intended to include a sensor network in the field, a central data platform, include a digital situation and data forecast model as well as a multi-channel warning and communication system. Procurement takes place in two service phases: 2.1.Performance phase 1 - system construction and test operation Conception and planning of the System architecture Building a sensor network Setting up the data platform and interfaces to existing data sources Test operation and validation of system functionality 2.2.Performance phase 2 - data forecast model supported analysis, forecasting and Expansion Development and integration of a data forecast model to evaluate the sensor data Use of machine learning methods to improve forecasts of heavy rainfall, runoff and flood developments Transition to permanent operation as well Maintenance and further development of the system. The aim of the project is to extend advance warning times, improve the basis for decision-making for emergency services and increase climate resilience...
Document Type: Contract Notice Reference Number: BaPa-2026-015 Contract Type: services Authority Type: org-sub Doc Title: Planning, construction and operation of a modular real-time early warning system with sensor network, data platform and data forecast model for Flood, heavy rain and drought events in the area of the ARGE Solidarischer Flood Protection e.V. Dispatch Date: 2026-05-08 Publish Date: 2026-05-11 Submission Date: 2026-06-11
Documents
Tender Notice