Procurement Summary
Country: Germany
Summary: Planning Services for Two Chp and Air Heat Pump Systems as Well as a Pth System Within Two Ichp Systems Including 10 Kv Transfer Station - Twb
Deadline: 22 Apr 2026
Posting Date: 31 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138753876
Document Ref. No.: R 6535/26
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71321000 - Engineering design services for mechanical and electrical installations for buildings
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The subject of this inquiry and the planning goal should be the conversion of the existing heating centers including a 10 kV transfer station, based on the HOAI service phases 1 - 9. The planning task is made up of the following components and systems: iKWK system according to KWKG §8b with: - Black-start natural gas CHP system (iKWK CHP) approx. 2, 200 -2, 500 kWel / 80°C at the Posener Straße location - Air-water heat pump (2-stage) approx. 2, 000 kWth, VL 80°C at the Posener Straße location - Electrode boiler or PtH system with approx. 10, 000 kWth at the Posener Straße location Ancillary systems such as: - SCR catalyst systems for both CHP locations - Auxiliary and operating resources (including oil, urea) for both CHP locations - Dismantling of the existing mixture cooling heat pump at the location Ratekauer Weg Process engineering integration with, among other things: - Pipes, fittings, pumps, ventilation, exhaust systems (chimneys available on site) Electrical engineering integration with: - 10 kV transfer station with current connection to one under construction 10 kV switchgear - The 10 kV transfer station should be planned in such a way that in the future (in approx. 5-10 years) it can be connected to a 110 kV switchgear (this should happen in the future via a 110kV/10 kV transformer) - transformer from 10 kV on low voltage (to power the LWWP) - the low-voltage main distribution (to power the LWWP) MSR and control technology integration with: - System automation - BuB system - Integration into the existing control technology and Telecontrol connections to the network control center - signaling/monitoring systems or connection to the existing systems on site (gas, fire, burglar alarm systems) Structural integration - property planning, structural planning and TGA for the technical building on the Posener Straße to accommodate the process engineering systems. This means that the two LWWPs should be integrated here. Existing areas within the existing heating sy...
Documents
Tender Notice