Procurement Summary
Country: Germany
Summary: Planning for the Replacement Construction of Pump Station 352 and the Associated Peripheral Systems at the Ronneburg Location in the Ronneburg Renovation Area of Wismut Gmbh, Service Phase 8 of the Object and Specialist Planning...
Deadline: 05 Sep 2026
Posting Date: 22 Jul 2026
Other Information
Notice Type: Procurement Plan/GPN/PIN
TOT Ref.No.: 145670302
Document Ref. No.: 506184-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71000000 - Architectural, construction, engineering and inspection services
71240000 - Architectural, engineering and planning services
71300000 - Engineering services
71320000 - Engineering design services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Planning for the replacement construction of pump station 352 and the associated peripheral systems at the Ronneburg location in the Ronneburg renovation area of Wismut GmbH, service phase 8 of the object and specialist planning... Planning for the replacement construction of pumping station 352 and the assigned peripheral systems at the Ronneburg location in the Ronneburg renovation area of Wismut GmbH, service phase 8 of the object and specialist planning Wismut GmbH operates a water treatment plant at the Ronneburg site in the Ronneburg renovation area (hereinafter referred to as WBA) and extensive dewatering systems (hereinafter referred to as WHA) for the promotion and treatment of contaminated seepage, pore, mine and surface water with subsequent release into the receiving water. The technical systems required to ensure long-term water collection and water treatment at the Ronneburg site must be adapted in terms of performance for long-term operation up to 2035, optimized in terms of energy and made resistant to damage Vandalism, environmental and climate influences. One of these systems is pumping station 352. This has been operated almost unchanged since 1990. Due to the progress in renovation, the rush of water to the pumping station has become clear in recent years declined. The pumping station is oversized for long-term operation. The structure and the structural shell do not meet the requirements of a pumping station that can be maintained in the long term. Due to renovation-related changes in the Terrain morphology (e.g. heap removal) and the creation of surface water drainage is the arrangement and positioning of the pumping station in the sense of flooding...
Document Type: Prior Information Notice Reference Number: 1245210-U67 Contract Type: services Authority Type: org-sub Doc Title: Planning for the replacement construction of pumping station 352 and the associated peripheral systems at the Ronneburg site in the area of renovation Ronneburg of Wismut GmbH, service phase 8 of object and specialist planning Dispatch Date: 2026-07-21 Publish Date: 2026-07-22 Submission Date: 2026-09-05
Documents
Tender Notice