Procurement Summary
Country: Germany
Summary: Optimization/Decarbonization of the Sewage Treatment Plant, Renovation of the Computing Building and Lifting System, Plant Construction and Locksmith Work
Deadline: 19 May 2026
Posting Date: 21 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139878472
Document Ref. No.: 271988-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: EUR 682600.00
CPV Classification
45223110 - Installation of metal structures
42996000 - Machinery for the treatment of sewage
42996500 - Sewage screens
44115100 - Ducting
42123000 - Compressors
45262670 - Metalworking
51510000 - Installation services of general-purpose machinery and equipment
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Optimization/decarbonization of the sewage treatment plant, renovation of the computing building and lifting system, plant construction and locksmith work At the Bad Kissingen sewage treatment plant, an extensive construction project is being carried out under the “Energy optimization/decarbonization of the sewage treatment plant”. Renovation carried out. The processing building at the Bad Kissingen sewage treatment plant is being completely renovated. This trade concerns plant construction and locksmith work. The existing serial coarse rakes will be replaced by 2 fine rakes arranged in parallel. This is in If the concrete channel is sufficiently wide, an appropriately designed partition wall made of stainless steel should be used. The rakes must be equipped with screenings washing presses. The discharge of the screenings into the two containers must be designed in such a way that the containers If necessary, they can be lifted upwards by the disposal company. The existing sand washer will be replaced with a new one. The inlet channel is provided with a GRP combination grate cover. The entire service water supply is being rebuilt in the computing building and the corresponding extraction points were set up. The heat supply to the machine room and the computing hall is ensured via 2 air heaters and associated heating cables. An explosion-proof ventilation system will be installed for the wastewater channel Hall ventilation relevant for explosion protection is also installed. A transport vehicle for the containers including an electric tug will be purchased to enable the containers to be moved by the sewage treatment plant itself...
Document Type: Contract Notice Reference Number: 2026-11/2022-0521-A/6e Contract Type: works Estimated Value: 682600.00 - EUR Authority Type: la Doc Title: Optimization/decarbonization of the sewage treatment plant, renovation of the computer building and lifting system, plant construction, etc. Schlosserarbeiten Dispatch Date: 2026-04-17 Publish Date: 2026-04-21 Submission Date: 2026-05-19
Documents
Tender Notice