Procurement Summary
Country: Germany
Summary: Object Planning for Buildings and Interiors Using the Bim Method -Bim Overall Coordination- in Accordance with Part 3, Section 1 Hoai 2021
Deadline: 21 Jul 2026
Posting Date: 18 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143530696
Document Ref. No.: 417710-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71000000 - Architectural, construction, engineering and inspection services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Object planning for buildings and interiors using the BIM method -BIM overall coordination- in accordance with Part 3, Section 1 HOAI 2021 As part of the planned construction project, a new building is to be built for the DRF air rescue, which is designed for 24-hour operation. The planning includes the construction of a new hangar building with an integrated social wing, two new parking positions for helicopters and a gas station. The existing FATO should be structurally adapted to the new legal requirements. On an approximately 1, 123 sqm A rescue helicopter of the type H145 (five-bladed rotor) from Airbus Helicopters - Christoph 47 - is to be re-stationed on the construction site, south of the existing air rescue station. By decision of the Ministry of Finance and Digitalization MV, this will happen Construction project realized as a BIM pilot project. As part of project management, the following BIM-specific roles can be expected to be used: overall BIM coordination and BIM author. Model-based project processing is carried out in service phases 2 - 8 carried out according to HOAI. In addition, the overall service includes processing up to performance level 5 or performance phase 9 HOAI (property management and documentation). According to VgV 2016, the planning is awarded through a negotiated procedure Participation competition. The applicant who, based on his offer, can expect the best possible solution to the task will receive the order. The planner to be commissioned initially requires performance level 1 (L...
Document Type: Contract Notice Reference Number: 26D10050G Contract Type: services Authority Type: ra Doc Title: Object planning buildings and interiors with BIM method -BIM overall coordination- according to Part 3, Section 1 HOAI 2021 Dispatch Date: 2026-06-17 Publish Date: 2026-06-18 Submission Date: 2026-07-21
Documents
Tender Notice