Procurement Summary
Country: Germany
Summary: New Sewage Treatment Plant in Weinsheim, Lot 1 - Construction Technology
Deadline: 17 Jul 2026
Posting Date: 18 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143530570
Document Ref. No.: 417657-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45223220 - Structural shell work
45247110 - Canal construction
45262212 - Trench sheeting work
45262210 - Foundation work
45112000 - Excavating and earthmoving work
45262310 - Reinforced-concrete work
45262311 - Concrete carcassing work
45262500 - Masonry and bricklaying work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
New sewage treatment plant in Weinsheim, lot 1 - construction technology The Verbandsgemeindewerk Prüm is planning to build the Weinsheim sewage treatment plant outside the town of Weinsheim on the K 179 in the direction of the B410 road to Prüm and Gerolstein. It is a biological sewage treatment plant for 3, 000 PE planned. For this purpose, the BIOCOS(R) process was identified as the preferred variant for wastewater treatment as part of an extensive comparison of variants. This process consists of a two-line structure, each with one aeration tank and two Sedimentation and circulation basins (SU basins). The wastewater first enters the aerated aeration tank, which is connected to the SU tank via inclined openings. During operation, ventilation takes place using the slanted openings and over Lift shafts allow the water and sludge quantities to be exchanged between the aeration tank and an SU tank. The second SU basin is not involved in the exchange during this time, but the sludge masses settle and a Clear water zone is formed. The clear water is led from the SU basin via an outlet and can be discharged into the receiving water as treated wastewater. The project will, among other things, supported with funding for a quick construction period. This requires parallel work on the trades and the strict adherence to the overall construction time. The deadlines specified in the contract must be adhered to. The overall wastewater treatment measure is divided into three main lots...
Document Type: Contract Notice Reference Number: 64/26 Contract Type: works Authority Type: la Doc Title: New sewage treatment plant in Weinsheim, lot 1 - construction technology Dispatch Date: 2026-06-16 Publish Date: 2026-06-18 Submission Date: 2026-07-17
Documents
Tender Notice