Procurement Summary
Country: Germany
Summary: New Construction of the Primary Clarification Tank and Conversion of the Old Primary Clarification Tank into a Bio-Phosphate Tank for the Gründau-Lieblos-Los 1 Sewage Treatment Plant
Deadline: 07 Sep 2026
Posting Date: 10 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146902525
Document Ref. No.: 550465-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71300000 - Engineering services
71320000 - Engineering design services
71321000 - Engineering design services for mechanical and electrical installations for buildings
71322000 - Engineering design services for the construction of civil engineering works
71327000 - Load-bearing structure design services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Engineering structure and technical equipment, system groups 1 + 7 Lot 2 - E54656766 Technical equipment system groups 2-5 + 8 HOAI 2021, Part 4, Paragraph 2 § 53 ff for AG 2-5 and AG 8 Lot 3 - E72171453 Structural planning HOAI 2021, Part 4, Paragraph 1 § 49 ff Engineering services according to HOAI 2021 - Object planning engineering structure - Specialist planning of technical equipment -Part 3 Object Planning, Section 3 Engineering Structures §§ 41 ff. all basic services § 43, gradual commissioning Lph 1-4 and optional Lph 5-9, -Optional local construction supervision, appendix 12.1, specific performance at Lph 8 -Part 4 Specialist Planning, Section 2 Technical Equipment §§ 53 ff., all Basic services § 55, gradual assignment Lph 1-4 and optional Lph 5-9 for the system groups: 1. wastewater, water and gas systems, 7. usage-specific systems and process engineering systems, -BBQ coordination -Safety and health protection coordination -Part 4 Specialist Planning, Section 2 Technical Equipment §§ 53 ff., all basic services § 55, Gradual assignment Lph 1-4 and optionally Lph 5-9 for the system groups: 2. heat supply systems, 4. Power systems, 5. Telecommunications and information technology systems, 8. Building automation and automation of civil engineering structures. -Part 4 specialist planning, Section 1 Structural Planning §§ 49 ff., all basic services § 51, gradual commissioning Lph 1-4 and optional Lph 5-6 -Optional reinforcement acceptance, appendix 14.1, specific performance at Lph 8 Doc Title: New construction of primary clarifier...
Document Type: Contract Notice Reference Number: Lot 1 Contract Type: services Authority Type: body-pl-la Doc Title: New construction of the primary clarification tank and conversion of the old primary clarification tank into a bio-phosphate tank at the Gründau-Lieblos-Los 1 sewage treatment plant Dispatch date: 2026-08-07 Publish Date: 2026-08-10 Submission Date: 2026-09-07
Documents
Tender Notice