Procurement Summary
Country: Germany
Summary: New Construction of the Digestion Plant Ka Müllekoven - Lot 02 Technical Equipment
Deadline: 07 Sep 2026
Posting Date: 10 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146906864
Document Ref. No.: 552086-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71000000 - Architectural, construction, engineering and inspection services
71321000 - Engineering design services for mechanical and electrical installations for buildings
71321200 - Heating-system design services
71321300 - Plumbing consultancy services
71321400 - Ventilation consultancy services
71323000 - Engineering-design services for industrial process and production
71323100 - Electrical power systems design services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
New construction of the digestion plant KA Müllekoven - lot 02 technical equipment New digestion plant at the Troisdorf-Müllekoven sewage treatment plant: The Troisdorf-Müllekoven sewage treatment plant is currently being expanded to accommodate 84, 000 inhabitants. The districts of Troisdorf, Troisdorf West, Friedrich-Wilhelms-Hütte, Oberlar, Sieglar, Eschmar, Rotter See, Kriegsdorf, Müllekoven and Bergheim form the catchment area of the sewage treatment plant. The predominantly municipal wastewater flows to the sewage treatment plant via a DN 1200 mixed water collector. One of the According to DIN 1995, both digesters have exceeded the technical lifespan of 50 years, and the second digester has almost reached its maximum technical lifespan. In addition, both containers are contaminated with asbestos. The agitators are outdated. The project includes the construction of new digester tanks (the current requirements planning envisages two digester tanks), the renewal of the heating system (plus building), the installation of new or existing combined heat and power plants (CHP), the increase in the gas tank volume and the Expansion of the electricity feed-in (emergency power feed-in, in the future additional feed-in through AGRI PV system). The new construction must be carried out while maintaining the existing sewage treatment plant operations. The multifunctional heating system for digester and Building heating (burns fermentation gas or oil) is approx. 30 years old and urgently needs to be technically replaced. It also serves as an emergency system in the event of a CHP failure. There are no more spare parts available...
Document Type: Contract Notice Reference Number: 26-09-07-1200 Contract Type: services Authority Type: body-pl-la Doc Title: New digestion plant KA Müllekoven - Lot 02 Technical equipment Dispatch Date: 2026-08-06 Publish Date: 2026-08-10 Submission date: 2026-09-07
Documents
Tender Notice