Procurement Summary
Country: Germany
Summary: Nb Hws Krottorf (Implementation of the Flood Berm) Environmental Construction Support and Property Planning for Outdoor Facilities
Deadline: 27 May 2026
Posting Date: 24 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140061837
Document Ref. No.: 26/N/0042/HB
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71313450 - Environmental monitoring for construction
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
In the section of the Bode between Widow Road (river km 61, 350) and Bode km 60, 600, the water profile will be widened. For this purpose, an approx. 7.0 m wide flood berm with a total length of approx. 807 m will be created on the right bank. The measure serves to hydraulically improve the drainage cross-section and to create an operational maintenance route along the stretch of water. During the course of the work, earthworks will be carried out to create the flood berm, including removal and Replacement of floor material. Furthermore, an access road in the Widow Street area and an angle retaining wall made of precast concrete elements will be built. In addition, an operational and maintenance route will be created. For construction work can be done in the area of Retaining wall requires temporary groundwater lowering. Construction period: July 27, 2026 - April 28, 2028 (with winter interruptions) Eco-friendly construction supervision is required for these construction services. Services in the construction phase: - Familiarization with existing documents -Construction preparatory services • Documentation of the actual condition of the off-limits areas before construction begins (photo documentation, description of the current state of use), which are not used for the construction work or are only used for a limited time or in some other way Form must not be affected. • Information on necessary avoidance and protective measures in accordance with the landscape conservation plan and the approval documents. Coordination with the client and the responsible authorities. Construction support -Control of construction taboo areas during the construction process. - Participation in the implementation of avoidance and protective measures (e.g. amphibian fences, taboo areas, tree protection) - Continuous coordination with the responsible authorities - Participation in the planning of the Construction process - Participation in the clarification of cases of damage that have ca...
Documents
Tender Notice