Procurement Summary
Country: Germany
Summary: Nb Hws Krottorf - Construction of a Flood Berm with Embankments (Implementation of the Flood Berm)
Deadline: 19 May 2026
Posting Date: 20 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139817655
Document Ref. No.: 26/N/0040/HB
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45240000 - Construction work for water projects
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
In the section of the Bode between Widow Road (river km 61, 350) and Bode km 60, 600, the water profile will be widened. For this purpose, an approx. 7.0 m wide flood berm with a total length of approx. 807 m will be created on the right bank. The measure serves to hydraulically improve the drainage cross-section and to create an operational maintenance route along the stretch of water. During the course of the work, earthworks will be carried out to create the flood berm, including removal and Replacement of floor material. Furthermore, an access road in the Widow Street area and an angle retaining wall made of precast concrete elements will be built. In addition, an operational and maintenance route will be created. For construction work can be done in the area of Retaining wall requires temporary groundwater lowering. The contractor's scope of services essentially includes the following services: • Construction of a flood berm to widen the profile of the Bode between river km 61, 350 and km 60, 600 with a Width of approx. 7 m and a length of approx. 807 m. • Creation of a embankment between river km 61, 275 and 60, 850 • Implementation of the necessary earthworks including removal of approx. 6, 500 m³ of soil and replacement or recycling of approx. 2, 500 m³ of suitable earth material. • Construction of a construction road with an area of approx. 18, 300 m² for construction site access. • Creation of a business and maintenance route with an area of approx. 12, 800 m². • Creation of access to the flood berm in the area Widow Street. • Construction of an angle retaining wall made of prefabricated concrete elements with a length of approx. 85 m. • Implementation of a temporary lowering of the groundwater in the area of the angle retaining wall, if necessary for construction. • Removal and Professional disposal of the stumps present in the construction site in connection with the earthworks (felling work has already been carried out). Construction work for water projects...