CITY ADMINISTRATION OF HERBOLZHEIM has floated a tender for Modernization of the Sewage Treatment Plant, Technical Equipment Expansion of the Sewage Treatment Plant, Ei&C Technology. The project location is Germany and the tender is closing on 07 Jun 2023. The tender notice number is 265604-2023, while the TOT Ref Number is 82480668. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Germany

Summary : Modernization of the Sewage Treatment Plant, Technical Equipment Expansion of the Sewage Treatment Plant, Ei&C Technology

Deadline : 07 Jun 2023

Other Information

Notice Type : Tender

TOT Ref.No.: 82480668

Document Ref. No. : 265604-2023

Competition : ICB

Financier : Self Financed

Purchaser Ownership : Public

Tender Value : Refer Document

Purchaser's Detail

Purchaser : CITY ADMINISTRATION OF HERBOLZHEIM
Address : Hauptstr. 26
Town : Herbolzheim
NUTS Code : DE135 - Rottweil
Postal Code : 79336
Contact Point : Juergen Rauer, Head of the City Building Department
Germany
Email :j.rauer@stadt-herbolzheim.de
URL :www.herbolzheim.de

Tender Details

The city of Herbolzheim is modernizing the Herbolzheim sewage treatment plant.

The plant will be expanded on the existing sewage treatment plant site.

The following measures will be carried out as part of the overall project:

. Replacement of the worm pumps

. Replacement of sand trap scrapers

. New construction 2nd biology

. New construction2. Secondary clarifier

. New construction of return sludge pumping station

. Mechanical equipment for new construction of secondary clarifier

. Mechanical engineering equipment for new construction of biology

. Modification of existing aeration tanks

. Replacement of aeration system

. Modification of DN tank to distribution structure

. Renovation of outlet measurement

. ERenovation of blower station

. Precipitant storage tank and dosing station

. Exchange of existing precipate dosing station

. Mechanical re-equipment process water system

. Expansion and renewal of the switchgear

. Demolition work

. Underground pipeline construction

. Dismantling

. Temporary arrangements

In followMeasures included in the following service description:

. New switchgear return sludge pumping station.

. Rewiring to the existing transformer station

. underground cable construction

. Expansion of the intruder alarm system

. Expansion of the existing PLS from Schraml

. Renovation and expansion of the external buildingelighting

. Renewal and expansion of the analytical measurement technology

. Measuring container

. Provisional measures

The conversion and expansion measures must be carried out while the sewage treatment plant is in operation.

The measures must be implemented in different construction phases (see framework schedule).

Doc Title: Sew...
Document Type : Contract notice
Reference Number : 2023/S 086-265604
Contract Type : Works
45252130 - Sewage plant equipment
45310000 - Electrical installation work
Authority Type : Regional or local authority
Type of Procedure : Open procedure
Regulation : European Union
Bid Type : Submission for all lots
Doc Title : Sewage plant equipment
Dispatch Date : 2023-04-28
Publish Date : 2023-05-03
Submission Date : 2023-06-07

Documents

 Tender Notice