Procurement Summary
Country: Germany
Summary: Mindenerwärme Gmbh - New Construction of a Wood Heating Plant (Biomass Heating Plant)
Deadline: 07 Jul 2026
Posting Date: 05 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 142709666
Document Ref. No.: 388065-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71000000 - Architectural, construction, engineering and inspection services
71240000 - Architectural, engineering and planning services
71250000 - Architectural, engineering and surveying services
71300000 - Engineering services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Property planning buildings and interiors Property planning traffic systems Specialist planning, structural planning Specialist planning technical equipment HLS Specialist planning technical equipment ELT 1. Initial situation The existing heating network supplies residential buildings via district heating as well industrial customers via a steam supply. The annual heat volumes are around 36 GWh of district heating and around 32 GWh of steam. The required peak output is around 18 MW in the district heating sector and around 11 MW in the steam supply sector. The Heat is currently generated entirely using fossil fuels. Against the background of the legal requirements for decarbonization, this results in an immediate need for transformation to ensure that it is permissible and economical in the long term sustainable network operation. 2. Regulatory project reason The construction of the wood heating plant is essentially regulatory driven. The basis is the Heat Planning Act (WPG), which requires a share of renewable energies of at least 30% by 2030 pretends. Further increases are planned by 2040 (to 80%) and 2045 (to 100%). 3. Project goal Wood heating plant The planned wood heating plant represents the first significant renewable generation unit in the transformation process. A Biomass boiler with an output of around 6 MW and around 4, 000 operating hours per year. The heating plant is primarily intended to cover the base load. By integrating the biomass plant, the proportion of...
Document Type: Contract Notice Reference Number: 302-2026 Contract Type: services Authority Type: la Doc Title: Mindenerwärme GmbH - New construction of a wood heating plant (biomass heating plant) Dispatch Date: 2026-06-04 Publish Date: 2026-06-05 Submission Date: 2026-07-07
Documents
Tender Notice