Procurement Summary
Country : Mauritania
Summary : Mauritania BESS Feasibility Study
Deadline : 27 Jul 2022
Other Information
Notice Type : Tender
TOT Ref.No.: 69231391
Document Ref. No. : 1282011
Financier : World Bank (WB)
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Expression of Interest are invited for Mauritania BESS Feasibility Study
The general objective of the terms of reference is to define the services to be carried out by the Consultant as part of the pre-feasibility study for the substations identified during the study conducted by a consultancy firm whose report will be made available.
The specific objectives of the study are: A comparative analysis of the various types of batteries. Analyses on the impact of batteries on the power system (efficiency, voltage plan, dynamic stability, etc.).A single-wire scheme for the Battery Energy Storage System (BESS) and the connecting equipment (switchgear and connections). The technical specifications of the BESS and the connecting equipment. Equipment layout plan for the BESS and connecting equipment. Specifications and requirements for integration with the electricity network supervision systems, particularly dispatching (SCADA: EMS, DMS). Static VAR compensator (SVC) opportunities to provide fast-reacting reactive power
Training needs for the management of a Batter
Documents
Tender Notice