Procurement Summary
Country: Central African Republic
Summary: Master Work Complete Works Of Signaling And Safety On The Corridor Douala- Kousseri
Deadline: 07 Jan 2015
Posting Date: 22 Dec 2014
Other Information
Notice Type: Tender
TOT Ref.No.: 2212848
Document Ref. No.: 112/SMI/MINTP/CELLULE BAD-BM/2014
Competition: ICB
Financier: World Bank (WB)
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
45316200 - Installation of signalling equipment
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
REPUBLIC OF CAMEROUNPaix - Job -Patrie ------------------ REPUBLIC OF CAMEROONPeace -Work - Fatherland
----------------- --------------- MINISTRY OF PUBLIC WORKS MINISTRY OF PUBLIC WORKS --------- ------
FACILITATION PROJECT TRANSPORT AND TRANSIT ENZONE CEMAC COMPOSANTECAMEROUN
SOLBidding OF EXPRESSION OF INTEREST
No. 112 / AMI / MINTP / BAD CELL -BM / 2014 du17 / 09 /2014
For the selection of consultants for the maitrised? Complete piece of signaling works and implementation a security device on the Douala- Kousseri Corridor.
No. Credit: 4987 -CM
No. in the PPM ( Servicede Consultants) The Government of Cameroon has re theRepublicceived funding from the International Development Association (IDA) and intends to use part of the proceeds of this credit to payments autitre perform the following contract : Mastery of complete piece of signaling and development work establishment of a safety device on the Douala- Kousseri Corridor.
the Consultant services (" services ") include two (02) midssionsdécrites summarized below :
Mission 1: technical studies necessary for the establishment of the detailed design (ODA) records Bidding (DAO) for signaling works and safety devices corridor (Douala - Kousséri ) Mission 2 : Control of work: Directorate of works (DET), scheduling, control, coordination(OPC ) desactivités the site and Assistance to reception operations ( AOR). Mission1 : Réalisationdes étudestechniques The route of the corridor is concerned : Douala - Yaounde - Ngaoundere Bertoua - Garoua - Maroua - Kousseri.
The sections under construction are not affected by the partieétude for their own signaling plans contained in contracts relating thereto. However, pour harmonieet ensure consistency of all signaling and safety and retenuedu corridor devices, different designalisation plans must be consulted and to make necessary relevant observations.
The study will account
.A :
the establishment and / or the complete rehabilitation of the vertical horizontaleet signaling throughout the corridor; the reparing some slides sécuritéarrachées, when possible; desglissières replacing damaged or missing, where necessary ( if clearly needed ), the replacement of existing rails by GBA barriers or other more efficient system to leszones risquesélevés or proven; repair and / or replacement of safety and restraint systems(barriers, etgardes corpsendommagés tags on some items); the installation of new security features and deretenue in some dangerous sections.
At the end of the road reconnaissancede, the consultant will produce a diagram of the route and a plot of the planet in the long axis highlighting a commentaireet a road cliché actions envisaged.
The statement of Itinerary parl''''utilisation GPS should give :
the general situation of the road ( corridor ), the current situation of signalisationhorizontale and vertical; the current situation of the slides etleur state, the position of the crossings, the cities and towns, and the intersections, summits coast and curves, etc.
Where possible, the different amounts of signals andof safety and restraint systems must êtredétaillées (eg total quantities defective quantities? )
The report prepared following the route of the statement must include:.
pictures positioned plan showing the current problems; detailed observations; lesactions considered; a copy of schémaitinéraire
At the end of the Consultant devraproduire Mission 1 :
an i- st.contribution reconnaissancede road ( Corridor : Douala - Kousséri ) with patterns of routes;
ii- A report of detailed design (ODA) for all work to be performed;
iii- A record of Appeld''''offres (DAO ) to carry signaling works and safety and restraint systems;
-A confidential estimate of work ( with sousdétail and price schedule ).
Note:This provision does not apply to lagéométrie nor pavement structures or work on the roadway and shoulders route
Mission. 2: Control and monitoring destravaux
It includes the implementation phase of the work, lesprestations following :
i- direction del''''exécution works contracts ( Validationdes implementation projects, establishment and transmissionservice orders, holding meetings and producing reports descomptes etrapports, control of technical provisions, audit and accounts of situations and a proposal to Maîtred''''Ouvrage for liquidation, assistance to the Client for arbitration and settlement litigation )
ii- scheduling, Steering and Coordination of construction sites ( analysisand validation of TAChes elementary, coordination among stakeholders, verification of construction site activities, followed by the company, support ALA development endorsements )
iii- receiving assistance operations ( Regulation of completion )
-the organization receiving desopérations;
-management del''''exercice guarantees by the company and the withdrawal of reservations.
iv- developings records of work performed;
v- supervising animation and awareness despopulations;.
vi - report writing end site
The Minister of Public Works invites firms Consultants ( "Consultants" ) Eligible to manifest leurintérêt to provide the services described above. Interested Consultants must provide information démontrantqu''''ilspossèdent the required qualifications and relevant experience to perform the services.
The criteria pourl''''établissement the shortlist are :
general experience in the field of road étudestechniques; specific experience in studies related to signaling and audispositif road safety matters; general experience in monitoring and incontrolroad works; the specific experience in the supervision and control of work related to signaling and safety device matièreroutière;. the specific experience on the control
It is worn ATTENTION Consultants that the provisions of paragraph 1.9 of the Guidelines: Selection and Employment of Consultants by World Bank lesEmprunteurs underIBRD loans and credits and IDA grants, janvier2011 edition accordance with decrédit4987 CM agreement (" Consultants Guidelines" ), relating to the rules of the World Bank''''s conflitd''''intérêts apply.
Consultants may associate with autresfirmes to enhance their skills in the form of a solidarity group or an agreementsubcontractor.
UnConsultant will be selected according to the method based on the quality and cost ( QCBS ) method as described in the Consultant Guidelines.
The Consultantsintéressés may obtain further information at the address below, on working days between nine ( 09) and fifteen (15) hours.
Lesmanifestations interest written in French in four (04) exemplaries ( 01 original and 03 copies) should be filed quality.illumina @ libero.it Mon below in person, by mail or email no later than Wednesday, January 7, 2015 to ten (10 ) hours heurelocale.
For the attention of Mr leMinistredes PublicsAgence works Project execution : Monitoring Unit of Road Projects execution, ADB / World Bank; Road Investment Department, Based in the Regional Delegation of Public Works of the Centre, Yaoundé.Téléphone : (237) 22-22-22-94; FAX: (237) 22-22-22-94E -mail: [email protected]
Yaounde, Minister of Public Works ________________Le ( Maîtred''''Ouvrage )