Procurement Summary
Country: Germany
Summary: Ka Mg-Neuwerk - New Construction of the Emsr Technology in the Blower Hall 2 (Gbh 2)
Deadline: 01 Apr 2026
Posting Date: 24 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138334351
Document Ref. No.:
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45252130 - Sewage plant equipment
45317200 - Electrical installation work of transformers
45311200 - Electrical fitting work
48921000 - Automation system
31730000 - Electrotechnical equipment
31170000 - Transformers
31321200 - Low- and medium-voltage cable
45315500 - Medium-voltage installation work
32581100 - Data-transmission cable
32562300 - Optical-fibre cables for data transmission
45312310 - Lightning-protection works
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
KA MG-Neuwerk - New construction of the EMSR technology in the blower hall 2 (GBH 2)
Deadline: April 1, 2026 CPV Code: 45252130-8 Equipment for sewage treatment plant 45317200-4 Electrical installation work for transformers 45311200-2 Electrical installation work 48921000-0 Automation system 31730000-2 Electrical equipment 31170000-8 Transformers 31321200-4 Low and medium voltage cables 45315500-3 Medium voltage work 32581100-0 data transmission cable 32562300-3 Fiber optic cable for data transmission 45312310-3 Lightning protection work Description of the service: Name: KA MG-Neuwerk - reconstruction of the EMSR technology in the blower hall 2 (GBH 2) Type of service: : Construction service Description: To ensure the existing process air supply for biological cleaning, a new one will be installed at KAMG-Neuwerk Blower hall (GBH2) built. This construction measure serves to ensure the operation of the existing biological cleaning system. At the same time, this measure represents redundancy in order to ensure that biological cleaning is maintained. The NV intends to divide the blower hall into several fire compartments. The maximum final configuration is eight fans. Four of these turbo compressors (blowers) are installed in two rooms. Two more are planned Emergency power systems (NEAs), with the associated components, must be set up in separate rooms (fire protection separation). The new transformer station 4 is planned to supply the systems and structures with electricity. The transformer station 4 includes transformers and NSHV built in GBH 2. The MV switchgear and the emergency network systems will be built in a separate measure. Other components of the project include six new transformers, two low-voltage main distribution systems, UPS systems and active components Harmonic filter. The fans are installed on site and are already equipped with passive harmonic filters...
Documents
Tender Notice