Procurement Summary
Country: Germany
Summary: K 2163, Free Route Albersroda from Albersroda to B 180 - Ceiling Renovation
Deadline: 10 Sep 2025
Posting Date: 26 Aug 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 125152657
Document Ref. No.: VST-163/2025/Br
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The district of Saalekreis plans to renovate the K 2163 from Albersroda from the town exit to the B180. The K 2163 is to receive a new asphalt cover layer. The roadway is delimited with banquets.
Due to the existing road width, there is no scope for variants. The district Saalekreis appears as a project carrier and as a building load carrier. There are no waters in the construction area.
The necessary construction work essentially includes:
- The diversion signage must be set up.
- The existing asphalt cover layer is to be milled, possibly occurring plaice are too eliminate.
- The dismantling of the guidelines must be carried out.
- The risk of risks must be carried out.
- The banquets must be peeled and stabilized and the lawn sowing must be carried out.
- The installation of the new asphalt cover layer must be carried out.
- The new guidelines are to be set up.
- The new road marking must be raised.
Rough quantities:
Remove 72 ST control posts
Remove 3500 m2 of the lawnoden
Peel 3500 m2 banquet
80 t banquet stabilization with lime
1300 T banquet material as supplementary material
Produce 3500 m2 lawn sowing on banquets
11000 m2 asphalt milling, depth 4.0 - 6 cm
1100 m2 allowance milling to the distance
Separate 70 m asphalt fastening
Clean 11000 m2 surface
Spray for 11000 m2 bitumen emulsion, milled, 250 to 350 g/m2
100 t profile compensation
Install 11000 m2 asphalt cover layer AC 11 DS, BK 3.2, D = 4 cm
Apply 11000 m2 of abscessed material
140 m seam or connection to the fugue Cross and longitudinal connection
Make 140 m joint filling
100 m risk renovation with a pull shoe
Spray 100 m2 of bitumen emulsion, under the asphalt argument
Delete 100 m2 reinforcement grille made of glass fibers (no grid fleece)
100 m2 reinforcement grille made of glass fibers (no grid fleece) mechanically
72 st Guide ...
The type of procedure: Location of the construction site: The K 2163 connects the OT Albersroda of the municipality of Steigra with the B 180 and is located in the southwestern part of the Saalekreis district in the state of Saxony. The renovation ...
Documents
Tender Notice