Procurement Summary
Country: Germany
Summary: Installation of Heating Systems
Deadline: 09 Jun 2026
Posting Date: 29 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140340927
Document Ref. No.: VG-2026-0070
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45331000 - Heating, ventilation and air-conditioning installation work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The city of Fulda intends to expand the Cuno-Raabe School at the Gallasiniring location with a combination of new building and existing buildings. The construction project is divided into two main components: Component A (new building): Construction of a three-story, Angle-shaped school block with a central atrium. The building houses administrative areas, specialist classes and modern learning clusters (teaching, differentiation and multifunctional rooms) on the upper floors. Component B (existing/church): Integration of a former church into the school campus through a "house-in-a-house" concept. The three-story installation includes a cafeteria, teaching kitchen, all-day areas and a media library. A special highlight is the “play deck” on the 2nd floor under the church roof. Both components are linked via a connecting building on the upper floor, which creates a covered break area on the ground floor and underlines the central campus character. Heating trade description: The installation is for the Cuno-Raabe School campus a modern heat supply and distribution system is planned. The central heat generation is housed in the basement of component B (existing church) and also supplies the new building (component A) via a local heating pipe that has already been buried on site. As The primary heat source is a highly efficient brine-water heat pump system in a double cascade with a total thermal output of approx. 160 kW. This uses a geothermal probe field made up of 21 boreholes that has already been manufactured on site. For the regeneration of the A heat exchanger for passive cooling operation is provided in the probe field. To cover peak loads, a gas condensing boiler will be installed, using the existing gas infrastructure and the chimney flue in the church's bell tower. The Domestic hot water is prepared decentrally throughout the property using electric instantaneous water heaters. Heating circuit distributors with high-efficiency pumps and continuous mixers are ...
Documents
Tender Notice