Procurement Summary
Country: Germany
Summary: House 65 - Renewal and Expansion of the Circulating Air Cooling Units - Msr-Technik-3.Ba
Deadline: 19 Jun 2026
Posting Date: 05 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 142724720
Document Ref. No.: 2024-007- 480-3BA
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The Magdeburg University Hospital intends to expand and renew the circulating air cooling units in the entire building at 65, Leipziger Straße 44, 39120 Magdeburg. The renovation work will be carried out in 3 construction phases. The implementation of the 3rd BA is now taking place. In house 65 The air conditioning and heating areas should be separated. Air conditioning chests are currently used in individual rooms to heat and air condition the rooms. These are to be replaced by separate heating surfaces and air conditioning units. The current connection of the Air conditioning chests are located on the floor below and run directly through the ceiling and floor. The new radiators should continue to be connected via the existing heating lines. New air conditioning units are becoming more and more new Laying cold pipes are connected in the respective hallway. These are installed directly above the door of the respective room. The new cooling lines connect to existing risers, some of which need to be extended. The radiators and Air conditioning units should be locked against each other to prevent the air conditioning unit from working when heating is needed or vice versa. The false ceilings in the hallway are opened on site with the help of the contractor. Dismantling the old cooling lines takes place with minimal effort in hallways and rooms that are already open or accessible. Existing refrigeration pipes that are no longer needed and require greater effort to dismantle should be shut down and blinded on both sides. For this purpose, no separate false ceilings are opened in the corridors or other rooms are made accessible. The work is carried out during the user's ongoing operations, so care must be taken to ensure that there is only the slightest disruption to the user. First done the construction of the new cooling routes in the corridors with the outlets for the respective rooms. The work will then be carried out room by room in order to...
Type of procedure: University Hospital Magdeburg A.ö.R. House 65 Leipziger Straße 44 39120 Magdeburg
Documents
Tender Notice