The landfall for the planned Ostwind 4 (OW4) HVDC cable system is located in Vierow, at the Greifswalder Bodden, Mecklenburg-Western Pomerania, Germany. For the landings, 3 Horizontal Directional Drillings (HDD) with cable ducts are planned. This Scope is Lot 1. ----
The landfall for the planned Bornholm Energy Island (BEI) HVDC cable system is located in Vierow at the Greifswald Bodden (Mecklenburg-Western Pomerania, Germany). For the landings, 3 Hori-zontal Directional Drillings (HDD) with cable ducts are planned. This Scope is Lot 2. ----
The landfall for the planned BEI HVDC cable system, is located at Sose Odde on the Baltic Sea Island of Bornholm (Denmark). For the landings, 3 Horizontal Directional Drillings (HDD) with ca-ble ducts are planned. This Scope is Lot 3. -----
Lot 4 to 6 are Combination Lots of Lot 1 to Lot 3. ----
For all lots, the landfall structure will be used to accommodate power cables. The subject of the contract is the full scope required for the planning and execution of the complete landing structure. Delivery and installation of the power cables are not part of the contract per lot.
As part of the engineering, detailed design, work method statements and related documents as well as the scope- and process-specific work and its conceptualization are to be implemented. Documentation of production, quality assurance and as-built planning are further components of the engineering.
The execution work scope includes the setup of the construction site bo...
Document Type: Contract Notice
Contract Type: works
Doc Title: HDD Landfall - Ostwind 4 and Bornholm Energy Island
Dispatch Date: 2025-06-06
Publish Date: 2025-06-11
Submission Date: 2025-07-04
Documents
Tender Notice