Procurement Summary
Country: Germany
Summary: Gs Steinhude: Extension/Conversion to an All-Day School - Air Conditioning, Component C
Deadline: 14 Apr 2026
Posting Date: 13 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 137712250
Document Ref. No.: 175276-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45330000 - Plumbing and sanitary works
45331000 - Heating, ventilation and air-conditioning installation work
45331200 - Ventilation and air-conditioning installation work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Indoor air technology, component C GS Steinhude: Extension/conversion to an all-day school - air conditioning, component C Extension/conversion of the Steinhude primary school Unter den Hestern 3 in 31515 Wunstorf to an open all-day school In the new building, component C is for mechanical loading and... Ventilation of internal toilet areas and the technical rooms requires installation of 3 decentralized ventilation devices (False ceiling installation). A split refrigeration system is necessary for the server room to dissipate the heat loads incurred by the IT. 2. System descriptions: Ventilation technology Ventilation systems C-01 and C-02 The two supply and exhaust air systems are as false ceiling devices, with integrated Heat recovery and single-stage filtering for the ventilation supply interior toilet areas Building C must be taken into account. The ventilation devices meet these requirements Requirements of the ErP Directive 2018. The system is designed in accordance with the requirements of the ASR for mechanical loading and Ventilation of toilets and showers. Ventilation system C-03 In building C is on the 2nd floor for the ventilation of the technical rooms Mechanical ventilation system for ceiling mounting (visible mounting) with heat recovery Build plate heat exchangers for moisture protection. For the server room and the MSR room becomes a 2-fold Air exchange is set, the heating center is set at 0.5 times Air changes taken into account. Sewer network The sewer and pipe network is made of galvanized sheet steel with cleaning openings taken into account according to VDI 6022, ...
Document Type: Contract Notice Reference Number: 14042026.0900 Contract Type: works Authority Type: la Doc Title: GS Steinhude: Extension/conversion to an all-day school - air conditioning, component C Dispatch Date: 2026-03-12 Publish Date: 2026-03-13 Submission date: 2026-04-14
Documents
Tender Notice