Procurement Summary
Country: Germany
Summary: Geotechnik
Deadline: 07 May 2026
Posting Date: 31 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138753621
Document Ref. No.: 26-029552
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71000000 - Architectural, construction, engineering and inspection services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
For the measures B2 local bypass (OU) Dietfurt, services are to be awarded for the preparation of geotechnical investigation reports (GB), both for the preliminary design (VE) and for the plan approval (PF). This should be the case for every engineering structure First one GB for the VE and at a later point in time one GB for each PF must be created. The same applies to the traffic facilities (route). The GB for the PF must be written in an appropriate level of detail so that the tender is based on them the construction work can take place. For some of the engineering structures, geotechnical design reports must also be prepared after the structural design has been completed (BW01, BW04, BW05, BW06). The project includes the 3-lane expansion and relocation the federal highway 2 near Dietfurt i. Mr. (Treuchtlingen city, Weißenburg-Gunzenhausen district). The B2 is to be expanded to three lanes throughout the entire section (see appendix “Site plan variant T8”). The planning by the Ansbach State Building Authority includes the Dietfurt bypass (OU) along the aforementioned federal highway. The Federal Republic of Germany bears the burden of construction. Four precipitation treatment plants are planned for the proposed measure. It is expected that there will be three rain retention basins (RRB) and a retention soil filter (RBF) were built (see appendices “RBF1” and “RRB1-3”). In addition, an approximately 360 m long noise barrier with a height of up to 5 m is planned. The appendices mentioned must be made accordingly when creating the GB take into account. The information on this should be included in the “Route” GB. The planned construction work for the Dietfurt bypass on the B2 federal highway as part of the preferred variant T8 begins south of the municipality of Dietfurt in Middle Franconia at the level of the Confluence of the municipal connection road to Haag near Treuchtlingen via Hürth and Neufang at station 1, 660 of section 2240 (construction km 0+000) and ends...
Documents
Tender Notice