Procurement Summary
Country: Germany
Summary: General Planning Services for New Construction of the Allerstrasse Brake Pumping Station
Deadline: 14 Jul 2026
Posting Date: 15 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143316094
Document Ref. No.: 406862-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71300000 - Engineering services
71000000 - Architectural, construction, engineering and inspection services
71240000 - Architectural, engineering and planning services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
General planning services for new construction of the Allerstrasse Brake pumping station The OOWV operates the “Allerstraße” waste water pumping station and a new storage basin that was built in 2022 on a former sewage treatment plant site on Allerstrasse in Brake. In normal operation The wastewater flowing in via gravity canals is passed on from the “Allerstrasse” pumping station directly to the Brake sewage treatment plant. If there is an increased inflow of wastewater, a portion of the wastewater can flow into the storage basin via storage pumps located in the pumping station be knocked off. After the inflow of wastewater from the sewer network has subsided, the stored wastewater is drained into the pumping station in a free fall and conveyed to the Brake sewage treatment plant. The maximum storage amount is approx. 2, 500 m3. The pumping station points significant structural defects. To replace the pumping station, a new pumping station will be built directly on the property. In addition to diverting the resulting wastewater to the Brake sewage treatment plant, the new pumping station is intended to handle increased wastewater inflow will again be used to feed the new “Allerstrasse” equalization basin and will collect the wastewater temporarily stored in the equalization basin after the inflow of wastewater from the sewer network has subsided and also convey it to the Brake sewage treatment plant. The SW pumping station is to be constructed as a reinforced concrete pumping station using in-situ concrete construction next to the compensation basin. The pumping station shaft should be vertically divided into a storage shaft and a pump cellar, which...
Document Type: Contract Notice Reference Number: 2026-04637 Contract Type: services Authority Type: body-pl-la Doc Title: Generalplanungsleistungen Neubau Pumpwerk Allerstraße Brake Dispatch Date: 2026-06-12 Publish Date: 2026-06-15 Submission Date: 2026-07-14
Documents
Tender Notice