Procurement Summary
Country: Germany
Summary: Gardening and Landscaping - Civil Engineering Work
Deadline: 27 May 2026
Posting Date: 28 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140280822
Document Ref. No.: BFN-5-04-00-XGL1
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45200000 - Works for complete or part construction and civil engineering work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Darmstadt intends to build a new main fire station for the professional fire department. The new station is located on a site at the northwestern entrance to Darmstadt, at the end of the B42, immediately southwest of the Gräfenhäuser sub-junction Street/Pfnorstraße available. The property has an area of approximately 30, 317 m² and a terrain elevation of approximately 121.7 m above sea level to 123.7 m above sea level. In preparation for the construction project, crossing canal stretches that had already been relocated or renovated were also moved into during the Dirty water can be discharged during the construction phase. The work advertised here involves further preparatory measures before the start of the shell construction work, in which the terrain is modeled, earthworks are carried out, construction pits are dug and installed Intermediate planum is to be produced. Start of construction preparation: July 20th, 2026 - Start of construction: August 10th, 2026 - Interim period: Completion of the drinking water transfer structure October 30th, 2026 - Interim period: Completion of the Rigolen tunnel with shaft structures February 19th, 2027 - Interim deadline: Completion of shaft construction, pump test stand March 25th, 2027 - Interim deadline: Completion of planum transformer September 24th, 2027 - Interim deadline: Completion for the start of the subsequent work on the shell construction UG December 23rd, 2027 - Completion: September 29th, 2028 Also includes load-bearing Bored piles as well as gravel piles and an angle retaining wall are included in the scope of services. Two tunnel trenches are to be built as infiltration structures, including the associated shafts. Before the asphalt base layer of all traffic areas is installed, which later Serve as construction roads in front of the shell and expansion, numerous supply and disposal media must be installed: drinking water, wastewater, garden water, tree irrigation, empty pipes, cable shafts and much more. Work...
Documents
Tender Notice