Procurement Summary
Country: Germany
Summary: Framework Agreement for Operational Route Maintenance in the Area of The Outskirts of Riedenburg 2026 - 2029
Deadline: 19 May 2026
Posting Date: 20 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139818671
Document Ref. No.: 2026-811-000052
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The tender includes the maintenance of sections of the service routes on the east and west sides of the Main-Danube Canal between Bachhausen lock (MDK-km 116, 200) and the mouth of the Danube near Kelheim (MDK-km 171, 300). Maintenance is done in sections with different procedures: Repair of areas with a top layer without binder: Tearing up the existing top layer without binders and installing a profile compensation. (0/32) in the respective profile. Creating the fine subgrade in profile. Installation of a top layer without binder (0/16) with a thickness of 3 cm. The service routes are generally 3.00 m wide. The cross profile is usually 4% towards the water side and the roof profile is 2.5% each towards the land and water sides to train. Clean the edge area of the road and the road by peeling off soil and pieces of vegetation. The peeled material must be picked up and transported by the contractor (AN) to a storage location assigned by the client. There it can be sampled and loaded and then recycled or disposed of by the contractor without any damages in accordance with the valid KrW-/AbfG. There is no current sampling available for the resulting peeled material. For this reason, the service specifications see a basic position for the recycling of peeled material Class 0 as well as three further requirement items if the material can be assigned to the assignment values F1/F2/F3 according to Replacement Building Materials Ordinance. The profile compensation, the subgrade and the top layer must be created using a grader. This is at to be taken into account in the calculation. Installations (slide caps, manhole covers, underground hydrants, groundwater measuring points, etc.) in the path area must be protected and/or adapted to the profile. The connections of the paths are at the bridges or at the access roads to adapt to the level of the access roads and bridges. Difficulties must be taken into account in the respective individual items. Before compacting, all the m...
Type of process: along the Main-Danube Canal in the area of the Bachhausen lock (MDK-km 116, 200) and the mouth of the Danube near Kelheim (MDK-km 171, 300)
Documents
Tender Notice