Procurement Summary
Country: Germany
Summary: Expansion of the Tengern Sewage Treatment Plant - Mechanical Engineering Secondary Clarification Tank 2
Deadline: 01 Jul 2026
Posting Date: 21 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 141753001
Document Ref. No.: 348575-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45350000 - Mechanical installations
45231113 - Pipeline relaying works
45252130 - Sewage plant equipment
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Expansion of the Tengern sewage treatment plant - mechanical engineering secondary clarification tank 2 Machine technology secondary clarifier 2 The municipality of Hüllhorst operates the Tengern sewage treatment plant, which was expanded in the 1990s. Parts of the old sewage treatment plant, such as: e.g. the trickling filter system is integrated. The Tengern sewage treatment plant is to be expanded to 17, 000 population equivalents and equipped with a second activation plant with aerobic sludge stabilization and secondary clarification. The strengthening takes place in two construction phases. This tender includes construction phase 1. The existing trickling filter system will be dismantled in a subsequent construction phase. In addition, a new company building will be built at a later date. The following measures are: planned: 1st construction phase (BA 1) - part of this tender 1.1 New sand storage area: approx. 7.0 x 9.3 m 1.2 New construction of aeration tank 2: 31.0 m diameter, 5.0 m depth 1.3 New construction of secondary clarifier 2: 24.0 m diameter, 3.9 m average water depth 1.4 New building Blower station: 12.6 m x 10.0 m in solid construction (masonry, corrugated metal profile) 1.5 New construction of return sludge pumping station 2: 4.3 x 4.6 x 2.75 m (LxWxH) 1.6 New construction MID shaft aeration tank 1: 4.35 x 2.75 x 2.95 m (LxWxH) 1.7 New construction of MID shaft for return sludge 1: 4.1 x 2.2 x 2.8 m or 4.05 m (LxWxH) The planning essentially includes: Construction site equipment Secondary clarifier scraper (round scraper with yellow bottom shield) Pipes made of stainless steel 1.4571 DN 80 and DN 500 switch...
Document Type: Contract Notice Reference Number: 202 2026 Hü Contract Type: works Authority Type: la Doc Title: Expansion of the Tengern sewage treatment plant - mechanical engineering secondary clarification tank 2 Dispatch Date: 2026-05-20 Publish Date: 2026-05-21 Submission date: 2026-07-01
Documents
Tender Notice