Procurement Summary
Country: Germany
Summary: Expansion of the Schiller School in Spaichingen
Deadline: 28 Apr 2026
Posting Date: 13 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139447285
Document Ref. No.: HARCH-2026-0001
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45200000 - Works for complete or part construction and civil engineering work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The city of Spaichingen intends to expand the Schillerschule elementary school with a three-story extension as a system or modular building made of wood or wood composite construction. The property for the implementation of the measure (area no. 3710) is limited by Schillerstrasse / Heubergstrasse and Lembergstrasse in the north-eastern urban area of Spaichingen. The extension for the care of primary school children is to be built as an addition to the existing primary school building. There is one on the ground floor of this building Canteen as well as kitchen and serving area provided. The necessary care rooms for 200 primary school students on the 1st and 2nd floors are to be accessed through the existing staircase in the existing building. The advantage is besides the cost-effectiveness Use of the existing staircase also from a self-sufficient extension. This means that during holiday periods or other school closing times, the childcare rooms can be used without opening the entire school building. The cafeteria on the ground floor should seat approx. 100 Provide students with a place to eat. It is intended to be used in multi-shift operation. Through a generous opening to the schoolyard, tables and benches are planned in the outdoor area so that lunch can be enjoyed outdoors in the warm months. From the rear Easy delivery of frozen food is possible in the paved area. This is portioned as needed, heated in the kitchen and handed out to the students and teachers in the serving area. The technical room is planned on the ground floor. A The existing multi-purpose room on the ground floor, which was previously used for holiday care, is to be converted and another room added so that the children from the special needs school (Baldenbergschule) can be looked after separately here. An elevator for Children with walking difficulties and supervisory staff should be located near the annex so that the care rooms can be accessed barrier-free. Barrier-free access to the ent...
Documents
Tender Notice