Procurement Summary
Country: Germany
Summary: Expansion of the Rauschen Waterworks General Planning Services
Deadline: 13 Apr 2026
Posting Date: 11 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 137547440
Document Ref. No.: 167861-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: EUR 7540000.00
CPV Classification
71240000 - Architectural, engineering and planning services
71000000 - Architectural, construction, engineering and inspection services
71200000 - Architectural and related services
71222000 - Architectural mapping services for Rural & Urban areas
71320000 - Engineering design services
71321000 - Engineering design services for mechanical and electrical installations for buildings
71327000 - Load-bearing structure design services
71800000 - Consulting services for water-supply and waste consultancy
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The general planning services for the expansion of the Rauschen waterworks (WW) in Heidelberg-Wieblingen are to be awarded. Expansion of the Rauschen waterworks general planning services In order to ensure Heidelberg's drinking water supply in view of In order to future-proof population growth, climate change and increasing quality requirements, the Rauschen waterworks must be fundamentally expanded and modernized. The infrastructure dates back to the 1960s and is outdated: None has taken place so far Treatment of groundwater (mainly Neckar bank filtrate). Fluctuations in quality in the past have already made temporary measures necessary. The current location is too cramped for modern processing levels. The planned concept: Expansion of the Waterworks noise on a neighboring property. Increase in quantities purchased from the Schwetzinger Hardt waterworks. Integration of permanent activated carbon filtration (with the option of later reverse osmosis). Construction of a new drinking water storage tank Pumping station. Two location variants were examined technically and economically. The finished concept draft including cost planning serves as the basis for further property planning. Key points of the waterworks expansion: Infrastructure & Storage: It's the New construction of a 24, 000 m3 drinking water storage tank is planned directly on site in order to increase security of supply in the long term. Technology & processing: The plant receives an additional processing level as well as...
Document Type: Contract Notice Reference Number: 2026-03-02/003 Contract Type: services Estimated Value: 7540000.00 - EUR Authority Type: pub-undert Doc Title: Expansion of the Rauschen waterworks general planning services Dispatch Date: 2026-03-10 Publish date: 2026-03-11 Submission Date: 2026-04-13
Documents
Tender Notice