Procurement Summary
Country: Germany
Summary: Expansion of Biomass Cogeneration Plant - Property Planning Building
Deadline: 09 Sep 2026
Posting Date: 10 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146905623
Document Ref. No.: 551589-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71000000 - Architectural, construction, engineering and inspection services
71320000 - Engineering design services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Expansion of biomass cogeneration plant - property planning building Planning services property planning buildings Awarding of services for property planning according to HOAI 2021 Part 4 Section 1, Service phases 1 - 4 according to § 34 ff. HOAI 1. General project description In As part of the municipal heat planning (KWP) of the city of Neckarsulm, the heat generators in the existing biomass cogeneration plant (BMHKW) will largely be replaced and additional energy generation and supply systems will be installed over the next few years. The Planning services phase 1 for the creation of the transformation plan were awarded to Ing. Büro Björnsen from Leonberg as part of the renewal of the thermal oil heater at the end of 2023. For this purpose, the guidelines for federal funding for efficient Heating Networks (BEW) applied for funding (Module 1, LHP 1-4), which was approved. The basic determination according to HOAI (LPH 1) and the creation of the transformation plan have been completed since autumn 2025. The variant decided by the local council 4 from this and subsequent planning services by Gammel Engineering GmbH for the technical building equipment (LPH 2-4) provides for an expansion of the existing biomass cogeneration plant in the future to include the following heat generators and services: • Two additional Biomass boiler including accessories (1.2 MW th. each) • Renewal of peak load boilers 1 + 2 (18 MW th. biomethane/hydrogen) • Flue gas condensation system including water-water heat pump (2 MW th.) • Two exhaust...
Document Type: Contract Notice Reference Number: 810-2025-0005.04VGV Contract Type: services Authority Type: la Doc Title: Expansion of biomass cogeneration plant - object planning building Dispatch Date: 2026-08-07 Publish Date: 2026-08-10 Submission Date: 2026-09-09
Documents
Tender Notice