Procurement Summary
Country : Germany
Summary : Expansion and Cultivation Kreishaus i for Control Center and Administration - Facade Work
Deadline : 08 Jul 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 120449110
Document Ref. No. : 2025-3-007
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
A new building will be built to expand the district house in Coesfeld. This has a rectangular floor plan with approx. 40m x 23m. The building extends over 4 floors and is 15.5m high. In Chapter II of the Statics, the concrete prefabricated facade is calculated. This includes next toThe pilaster and the cladding of the parapet also the expression as a clinker facade. The facade is divided into a grid of 2.7m on the ground floor and 1.35m on the upper floor. Here, the elements on the upper floors cover the two -time grid with 2.7m. There are also special elementsWith a width of 4.05m that cover the triple grid. The height of the individual elements in the 1st to 3rd log approx. 3.75 to 3.90 m high in the ground floor approx. 4.20 m. The elements basically consist of a parapet part that is arranged under the windows and the vertical pilotDividing the facade into the 1.35m grid. The parapet is covered with clinker straps. In the area where no window is arranged on the shell, but a continuous wall is present, the elements between the raids are bricked up with clinker stones. In the attached calculationChapter II are considered to be ready for reinforced concrete and their attachment to the shell. The subject of the attached statics in Chapter III are the clinker facades, which are always arranged between the pilgrims. As a rule, the wall is carried out on the concrete, which is underneath, whichAnchoring is carried out using the air shift tanker in accordance with the standard or manufacturer. However, there is a so -called filter masonry. Halfby in a regular grid is eliminated. In some cases, the filter masonry is arranged in front of reinforced concrete walls and partly in front of window openings.Basic data: Prefabricated part facade - 1250m2, of which: clinker - 406 m2 clinker (filter masonry) - 75 m2
Additional Classification Codes Quantity
Expansion and cultivation Kreishaus I for control center andAdministration ...
Documents
Tender Notice