Procurement Summary
Country: Germany
Summary: Execution of Window Construction Work - 2Nd Ba Component B High School School Center Steinlach-Wiesaz in Dußlingen
Deadline: 08 Jun 2026
Posting Date: 27 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140213049
Document Ref. No.: LOT-0001 1034_SZSW-BT B
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45441000 - Glazing work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The planned new specialist class building BT B of the high school consists of a two-story rectangular main building with a green flat roof, which has a two-story connecting hallway on the south-east facade and a newly constructed one A two-story extension will be connected to the existing administration and auditorium building A of the high school. The new specialist classroom building consists of a ground floor and an upper floor, as well as a partial basement. The ground floor height of the new school building is approx. 3.90 m and on the upper floor up to the extensively planted flat roof approx. 4.00 m. /// Area information: Size of construction site for demolition and new construction BT B: approx. 2, 785 sqm. /// GFA: Level 0 (ground floor) 1, 513.43 sqm, total GFA: 3, 243.10 sqm, total BRI: 14, 555.95 cbm /// Construction: The building is as Reinforced concrete structure designed with flat ceilings, reinforced concrete columns and shear walls. The building is stiffened by the reinforced concrete wall and ceiling panels. The columns in levels 0 + 1 are designed as composite columns. Wall components in contact with the ground are realized as a WU construction. The four-sided arcade on level 1 is attached as a steel structure to the reinforced concrete shell facade. The new building is founded as a shallow foundation on a gravel base layer. Rim beams reinforce this highly stressed base plate edges and also serve as frost aprons. The outer facade is formed by vertical wooden planks at a grid spacing of approx. 1.20 m with a ventilated vertical wooden cladding on a wooden frame construction thermal shell, as well as window strips in wood and aluminum with parapets. /// The sustainability criteria according to Sustainable Building in Baden-Württemberg (NBBW) from the State Ministry for Regional Development and Housing of Baden-Württemberg apply and are in the execution must be taken into account. /// The window construction services include: Highly insulated wood-alumi...
Documents
Tender Notice