Procurement Summary
Country: Germany
Summary: Environmental Services for the Construction of the Helmsheim Flood Retention Basin (Cef Species Protection Measures, Ecological Construction Supervision, Compensatory Measures)
Deadline: 08 Sep 2026
Posting Date: 07 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146758251
Document Ref. No.: 549866-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71313450 - Environmental monitoring for construction
90721700 - Endangered species protection services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Environmental construction support for the construction of the Helmsheim flood retention basin Ecological, soil science and water ecology construction support as well as species and water-related expert reports required for the construction of the HRB Helmsheim. The city Bruchsal is planning to build and operate a flood retention basin in the Saalbachtal between the Bruchsal district of Helmsheim and the municipality of Gondelsheim. The area lies within the boundaries of the city of Bruchsal, the city of Bretten and the municipality Gondelsheim. The planned basin is designed to protect against a 100-year flood and covers an impoundment area of approximately 22 hectares with a net retention volume of 380, 000 m³. The project represents an intervention in nature and landscape in accordance with Section 14 Paragraph 1 BNatSchG in conjunction with Section 14 Paragraph 1 NatSchG Baden-Württemberg. The intervention must be compensated for in accordance with Section 15 Paragraph 2 BNatSchG and Section 15 Paragraph 2 NatSchG. Therefore, comprehensive ecological studies were carried out parallel to the approval phase The necessary measures are recorded in an EIA report with an integrated landscape conservation plan. The specifications of the EIA report with integrated landscape conservation support plan and the species protection compatibility study are to comply. Compliance with these points must be ensured by environmental construction supervision. The specified avoidance, reduction, compensation and replacement measures must be implemented as described. In the ...
Document Type: Contract Notice Contract Type: services Authority Type: body-pl-la Doc Title: Environmental services for the construction of the Helmsheim flood retention basin (CEF species protection measures, ecological construction supervision, compensatory measures) Dispatch date: 2026-08-05 Publish Date: 2026-08-07 Submission Date: 2026-09-08
Documents
Tender Notice