Procurement Summary
Country: Germany
Summary: Energy Utilization Swabia Gku, Shell Construction Work Production, New Construction of a Sewage Sludge Drying Facility with Pyrolysis and Administration Building
Deadline: 09 Apr 2026
Posting Date: 11 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 137559504
Document Ref. No.: 169133-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45223220 - Structural shell work
45000000 - Construction work
45113000 - Siteworks
45112000 - Excavating and earthmoving work
45231100 - General construction work for pipelines
45223500 - Reinforced-concrete structures
45262400 - Structural steel erection work
45262300 - Concrete work
45223800 - Assembly and erection of prefabricated structures
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Construction description: The planned building consists of halls for the sewage sludge upcycling plant and an administration building. The hall is an L-shaped structure with a total length of 60.00 m and a width of 40.10 m. The hall is on the ground floor. The The northern part of the hall, in which deliveries are housed, has a partial basement. The ridge height of the pent roof is approx. 11.12 m. The long side of the hall has a pent roof height of approx. 16.20 m. There is one in the south-western part of the hall Pellet heating. The hall will be constructed in reinforced concrete frame construction with a roof structure made of wooden trusses with sandwich panels. The total gross floor area of the hall is 1, 642 m². In the southwest of the hall is the administration building, which is connected by a Fire wall is created separately. The administration building consists of a ground floor and an upper floor. It is 15.19 m long and 9.89 m wide. The entire building is constructed of solid reinforced concrete. The roof is as Flat roof created with parapet and bitumen waterproofing. The top floor, where lounges are possible, is on average 3.21 m above the ground surface. The administration building consists of one usage unit. The gross floor area of the Administration building is 151 m² height 7.00m. The list of services and the schedule are also referred to. Energy utilization Swabia gKU, shell construction work production, new construction of a sewage sludge drying plant...
Document Type: Contract Notice Reference Number: 0130-26 Contract Type: works Authority Type: body-pl-la Doc Title: Energy utilization Swabia gKU, shell construction work production, new construction of a sewage sludge drying facility with pyrolysis and administration building Dispatch Date: 2026-03-09 Publish Date: 2026-03-11 Submission Date: 2026-04-09
Documents
Tender Notice