Procurement Summary
Country: Germany
Summary: Electrical Systems
Deadline: 25 May 2026
Posting Date: 27 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140213380
Document Ref. No.: 53/2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45311000 - Electrical wiring and fitting work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The construction project includes the complete dismantling of the visible existing electrical installation including all electrical cables, sockets and existing distribution systems. Cables in ceilings and walls that are not visible remain in place except the ceiling and wall are opened for the construction work and the cables create an obstruction. A new distribution system including a meter cabinet will then be set up. Some earthworks are required to carry out the work. Wall openings are also required to lay the new distribution system. There are a total of 51 hotel rooms and several office rooms on the upper floors. The hotel rooms have an average area of approx. 14 m² and are each Equip with up to 8 sockets. The necessary power connections and lighting systems must be newly installed in all rooms and offices. The necessary data connections must also be installed in the offices. The relocation of the Cables from the sub-distributors to the hotel rooms are routed via the hallway area on a newly constructed route. In addition, a KNX-based blind control system will be installed in the hotel rooms on floors 2 to 5. This includes assembly and Integration of a weather station on the roof and connection to the reception on the ground floor. The existing safety lighting must also be replaced. For this purpose, group battery systems must be provided on the floors and in the new electrical installation to be integrated professionally. The measure also includes the electrical connection of the PV system. This includes the cabling of the PV modules pre-assembled on site within cost group 300, their connection to the inverter and the Integration of the PV system into the house network. As part of the construction of the PV system, the roof will be renovated on site as part of cost group 300. In addition, the existing lightning protection system...
Documents
Tender Notice