Procurement Summary
Country: Germany
Summary: E31.1 Technical Planning Tga-M; Renovation Mdh - 1St Sub-Measure (A1.2)
Deadline: 17 Apr 2026
Posting Date: 18 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138037355
Document Ref. No.: EK-Bau-2026-0008_45
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71300000 - Engineering services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Renovation of Max-Delbrück-Haus (MDH or House 31.1) - Awarding of specialist planning services for technical equipment in accordance with HOAI §55, system groups 1, 2, 3, 7 and 8 in accordance with HOAI §53 LP5-LP9. The services include planning services for the demolition work of the v.g. System groups, the associated interim measures as well as for the renewal of the above mentioned. System groups in the building as well as the renovation of underground pipes below the floor slab and in the area of the outdoor facilities. Form the basis of the planned measures in particular a feasibility study, a concept for the “basic and energy-efficient renovation of Max-Delbrück” from 2022 as well as the design and approval planning that is currently being prepared. The project is largely made up of Funded by federal (90%) and state (10%) grants as well as third-party funds. This is a grant measure in the sense of: §44 BHO according to RZBau; the BBR is entrusted with testing and control activities. The MDH is the largest research building on the Berlin-Buch campus of the Max Delbrück Center (NUF 10, 700 sqm), the "heart" of scientific research at the MDC with around 50% of the scientific working groups. The house is part of building complex 31 (31.1, 31.2 and external technical center 31.3). It was put into operation in 1980 and was renovated for the first time in the 90s. The building was constructed as a prefabricated reinforced concrete structure in a 7.20 m grid according to the “SK Berlin” system. The capital goods (laboratory equipment, expansion) have a lifespan exceeded. With the majority of laboratory space, the building is also the MDC's largest energy consumer. Against the background of the energy transition and future changes to the legal situation, a significant reduction in energy consumption is essential. Therefore The house is to be renovated gradually (in 2 partial construction measures) between 2024 and 2031, thereby achieving a reduction in energy consumpt...
Documents
Tender Notice