Procurement Summary
Country: Germany
Summary: Drilling Sinks - New Construction of All-Ip Communication Network, Trübpl Altengrabow, Möckern (Mbb-2026-0180)
Deadline: 11 May 2026
Posting Date: 13 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139447527
Document Ref. No.: MBB-2026-0180
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
"Trenchless pipe filling (soil pressure / drilling fluid process - HDD) - TrÜbPI Altengrabow, new construction of communication network (All-IP)" The subject of the lot is trenchless construction methods for the production of pipe routing in the Altengrabow military training area. Pipe jacking work must be carried out using the soil displacement method (soil pressure/earth rocket) including starting and target pits, securing evidence/settlement control and documentation as well as horizontal flushing drilling (HDD/drilling flushing method) incl. Construction site setup/site preparation, start/finish pits, drilling and collection work, flushing management and waste disposal. The HDD cable routing is carried out in sections and must be manufactured in such a way that the energy/medium voltage routing and the IT empty pipe route must be routed separately. Injection pipes (3xDN 50) must be provided for the IT route (made pressure-tight, calibrated/testable). The potential control/earthing conductor must be carried in the ground (introduction during pullback/retraction, Exit on both sides and connection to defined grounding/potential equalization points). The work is carried out in the homogeneous areas according to the subsoil report: Earth-O (top soil), Earth-A (sands/silty sands) and Earth-B (filling/building rubble possible, selectively). Quantities / scope (lot total quantities, approx.) Soil pressures (earth rocket): 12 pieces including associated public/target pits as well as documentation and preservation of evidence/settlement control. Drilling fluid method (HDD): a total of approx. 4, 300 m, of which • Shooting range area: approx. 3, 900 m (continuous trench-less route) • Command area: approx. 150 m (additional HDD section) • Left construction area: approx. 250 m (additional HDD section) Additional Classification Codes Quantity
Documents
Tender Notice