Procurement Summary
Country: Germany
Summary: Development of Bg Dietenbach: Distribution Network
Deadline: 06 Jul 2026
Posting Date: 29 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140343331
Document Ref. No.: 26-050
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45112100 - Trench-digging work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Title District heating: approx. 2, 270, 000 EUR Civil and pipeline construction work District heating: The pipes are laid in an open trench, pipe type: plastic jacket pipe as a single pipe, pipe length: approx. 110 m DN200, 30 m DN150, 320 m DN125, 120 m DN100, 140 m DN80, 340 m DN65, 240 m DN50, 160 m DN40, 100 m DN32, medium pipe: steel, thermal insulation: insulation series 3, composite insulation made of PUR rigid foam - casing pipe: plastic (PE-HD), transport medium: water, nominal pressure level: PN 16, operating temperature Flow: 95 °C, operating temperature return: 55 °C, network monitoring system: Nordic. Title Drinking water: EUR 395, 000 Civil and pipeline construction work Drinking water: The pipeline is laid in an open trench. Pipeline construction: approx. 850 m, DA 315 PE-HD PN 10 approx. 2, 100 m, DA 180 PE-HD PN 10 Earthworks: approx. 3, 200 m³ excavation title electricity: 150, 000 EUR - laying in an open trench. DA 125 PVC pipe lengths: approx. 5000 m Excavation and backfilling: approx. 450 m³ with a route length of approx. 550m Title road construction: To ensure sufficient pipe coverage, a fill made of frost-proof delivery material (frost protection layer according to ZTV-E StB and TL SoB-StB) should be created as part of this construction project. The tree quarters should be equipped with one filled with suitable tree substrate and provided with a root protection film. Re-profiling the dam: approx. 170, 150.00 EUR Installing the filling of pipes: approx. 409, 200.00 EUR Installing tree substrate: approx. 268, 800.00 EUR Installing root protection film (depth 1 m): approx. 16, 250.00 EURLine construction: district heating DN32 to DN200, KMR single pipe, insulation series 3, line construction: drinking water DA 125 - 315 PE-HD RC The entire pipeline material is provided on site via the client's central purchasing department. Here only the relocation takes place material provided. Empty pipe construction: Electricity DA 125 PVC Road construction: 1. Re-profi...
Documents
Tender Notice