Determination of the Ecological Minimum Water Flow Tender - 140217298

The STATE OFFICE FOR THE ENVIRONMENT, AGRICULTURE AND GEOLOGY has issued a Tender notice for the procurement of a Determination of the Ecological Minimum Water Flow on the Legnitzka and Buchholzer Wasser in the Germany. This Tender notice was published on 27 Apr 2026 and is scheduled to close on 28 May 2026, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 140217298, while the tender notice number is Vergabe Nr.: 44-Z355/26, IntraPlan Nr.: 230293 and Registering on the platform.

Expired Tender

Procurement Summary

Country: Germany

Summary: Determination of the Ecological Minimum Water Flow on the Legnitzka and Buchholzer Wasser

Deadline: 28 May 2026

Posting Date: 27 Apr 2026

Other Information

Notice Type: Tender

TOT Ref.No.: 140217298

Document Ref. No.: Vergabe Nr.: 44-Z355/26, IntraPlan Nr.: 230293

Competition: ICB

Financier: Self Financed

Purchaser Ownership: Public

Tender Value: Refer Document

CPV Classification

90000000 - Sewage, refuse, cleaning and environmental services

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_detailsLogin to see details

Tender Details

Objective The ecological minimum water quantities of the Legnitzka and the Buchholzer water are to be met taking into account the legal basis (WHG, OGewV, WWRL) as well as the above-mentioned LAWA recommendation, the biotope runoff approach described therein or a possible using a simplified procedure. The minimum requirements necessary for the biocenosis with regard to water depth and flow velocity and the resulting flow rate are determined by measurements at various locations in the Identify the course of the water. The ecological minimum water flow derived from this should then be classified with regard to the flow regime (depending on the available data in relation to (quasi)natural and/or actual flow). The method used to determine the minimum ecological water flow should subsequently be analyzed and evaluated with regard to its practicability on the rivers, building on recommendations already developed from another study can be. Among other things, the necessity of the procedural steps, ways to simplify the process or the use or collection of additional data must be discussed, followed by practical recommendations for monitoring and compliance to derive minimum water flows from the bodies of water or to validate the recommendations that have already been developed. In addition, based on the findings from the inspections and measurements, possible measures to be taken on the sample bodies of water must be shown could lead to reducing the ecologically required minimum water flow. For example, in the case of unnaturally wide water profiles (e.g. for the drainage of swamp water in mining-influenced waters), measures can be taken to create a more natural design of the water course with structural elements mean that even lower flow rates are sufficient to settle and maintain the fauna and flora specific to the water type. There are still the specific...

Documents

 Tender Notice


Similar Tenders

Request Demo
GiZ Tenders India

Procurement Documents for Germany

Access a comprehensive library of standard procurement documents specific to Germany. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Germany

Explore Procurement Documents for Germany


Want To Bid in This Tender?

Get Local Agent Support in Germany and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?